flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Energy Analysis No Longer a Luxury

Energy Analysis No Longer a Luxury


November 2, 2010
This article first appeared in the November 2010 issue of BD+C.

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

“Energy is now a variable cost on the balance sheet, particularly with healthcare projects,” says Greg Turner, director of global offerings, Honeywell Building Solutions. “What we see happening for facilities managers is they’re talking to CFOs more regularly and the question is always. ‘What’s my energy cost going to be next quarter?’”

Building Teams and facility managers are using these energy analysis tools to keep clients’ bottom lines low and meet regulatory requirements for energy saving.

Green Building Studio: Innumerable design iterations

Green Building Studio is a Web-based tool that can help architects and designers perform whole building analysis, optimize energy efficiency, and work toward carbon neutrality earlier in the design process. Available via subscription service at www.greenbuildingstudio.com, Green Building Studio uses the DOE-2.2 simulation engine to calculate energy performance. It also creates geometrically accurate input files for EnergyPlus, the Department of Energy’s building simulation program. Crucial to the integrated interoperability of the program is the gbXML schema, an open XML schema of the International Alliance of Interoperability’s aecXML group. By using gbXML-enabled applications, Green Building Studio Web service users can eliminate redundant data entry and dramatically reduce the time and expense traditionally associated with whole-building energy simulation analyses.

“Our users will perform 50 to 100 iterations of a design,” says John Kennedy, senior manager, sustainable analysis products for Autodesk AEC Solutions and the CEO of GBS from its founding in 2004 through its acquisition by Autodesk in 2008. “They try out everything from type of glass to different levels of insulation, and each iteration requires a full simulation for proper energy use estimates. Running off of the Web, our users can run these calculations from the cloud and perform them a lot faster than if they were tied to their desktop resources.”

Engineering firm Glumac, based in Portland, Ore., uses GBS for energy analysis on many of its projects, such as the University of Hawaii at Manoa Recreation Center. Glumac’s scope of work included design review, whole building energy simulation, computational fluid dynamics analysis for natural ventilation, and sustainability consulting. The 67,000-sf project includes activity courts, locker rooms, aerobics facilities, and free weights. Glumac used GBS to quickly iterate energy consumption estimates for a variety of exterior shading devices, understanding energy use driven by landscape shading elements, and the effects of several different glazing configurations.

“Traditional analysis would have been too cumbersome to address these questions within our budget or within a fast enough timeframe to provide meaningful feedback to the design team,” says Skander Spies, an energy analyst in Glumac’s Portland office. Glumac created the initial geometry in Revit, then was able to import it into Green Building Studio and export a file compatible with other advanced analysis tools, such as EnergyPlus or eQuest. “This process results in more geometrically accurate models that take less time and budget to create, allowing our team to spend more time looking at the issues that matter,” says Spies.

In its most recent subscription update, Autodesk made the GBS service available to anyone with a Revit Architecture or Revit MEP subscription and integrated its features into Revit’s massing feature. Now, energy results are automatically updated in Revit, the company’s native building information modeling program.

“Building owners are asking more often for in-depth analysis,” says Autodesk’s Kennedy. “They want stronger performance guarantees for both new designs and renovations, and they’re asking about the drivers of building performance. We’re moving in the direction of making that data a normal, automated process.”

IESVE: Integrating documentation and design

Integrated Environmental Solutions was founded in 1994 in Scotland with the goal of developing primarily academic tools for building performance design and analysis and bringing them into mainstream use, according to founder and managing director Don McLean. In the interim, the company has launched commercially viable software that has grown to encompass design and analysis for all building design disciplines. Its products span a range of price and performance levels from the free and easy to the most detailed and rigorous.

IES’s main tool is its Virtual Environment (VE) Pro, a suite of software that integrates the entire process of designing buildings for environmental and energy considerations. Each module of the VE suite—for example, VE/Mechanical, VE/Electrical, or VE/Lighting—is tailored to analyze specific performance components of buildings. VE/Thermal includes energy performance measurement tools such as Apache SIM, Apache HVAC, and MacroFlo for total building and room-by-room energy calculation, simulation, and HVAC system design. VE Pro includes a full 3D modeling program for AEC professionals who want to create their designs natively. It can also import from Revit, SketchUp, or the gbXML file formats.

“You can perform the level of analysis you want all in one platform,” says Suzanne Robinson, an energy consultant at IES. “How detailed your building becomes is up to the user. We just want to engage them from the beginning in the design stage.”

VE Pro users can create baselines that integrate documentation in their design processes. The program’s LEED toolkit keeps track of compliance with LEED criteria and points across LEED-NC V2.2/V3, LEED for Schools V1/V3, and LEED Core and Shell V2/V3. The Sustainability VE toolkit tracks climate, natural resources, building metrics, construction materials, energy, carbon, daylight, solar shading, water, low- and zero-carbon technologies, and ASHRAE/CIBSE heating and cooling loads.

“It’s such a robust software engine we can more easily model complex designs,” says Mark Chu, a building physicist in AECOM’s advanced design group, based in Orange, Calif. “We can model things that we couldn’t before because the software isn’t constrained.”

Some of the projects AECOM has used VE Pro for energy modeling include the NASA Ames N232 Collaborative Support Building (registered for LEED Platinum) and NASA Johnson Space Center Building 26 (registered for LEED Gold).

Honeywell Energy Manager: Pinpoint performance issues

Energy Manager is a Web-based advanced energy management and information system designed to capture, analyze, and act on data to help solve energy problems in existing buildings. Energy Manager’s software uses an existing building’s in-place infrastructure to track energy dollars, impact of weather on consumption, and similar energy-related issues.

If a room or floor has leaky windows, Energy Manager can isolate higher heating costs in that area and report the problem back to the facility manager. It also uses diagnostics to show metrics and behaviors of pieces of equipment to be analyzed for peak performance. Energy Manager’s data can be accessed anywhere from the Web and can be used to set up daily or weekly weather-neutralized energy consumption reports e-mailed directly to supervisors.

“It’s designed to mine data,” Turner says.  “You can create as many virtual metering solutions as your building needs. It’s designed to let customers add the functionality they need without adding new systems.” BD+C

—Jeff Yoders, Contributing Editor

Related Stories

| Feb 11, 2011

Iowa surgery center addresses both inpatient and outpatient care

The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.

| Feb 11, 2011

Grocery store anchors shopping center in Miami arts/entertainment district

18Biscayne is a 57,200-sf urban retail center being developed in downtown Miami by commercial real estate firm Stiles. Construction on the three-story center is being fast-tracked for completion in early 2012. The project is anchored by a 49,200-sf Publix market with bakery, pharmacy, and café with outdoor seating. An additional 8,000 sf of retail space will front Biscayne Boulevard. The complex is in close proximity to the Adrienne Arsht Center for the Performing Arts, the downtown Miami entertainment district, and the Omni neighborhood, one of the city’s fast-growing residential areas.

| Feb 11, 2011

Chicago architecture firm planning one of China’s tallest towers

Chicago-based Goettsch Partners was commissioned by developer Guangzhou R&F Properties Co. Ltd. to design a new 294,570-sm mixed-use tower in Tianjin, China. The Tianjin R&F Guangdong Tower will be located within the city’s newly planned business district, and at 439 meters it will be one of China’s tallest buildings. The massive complex will feature 134,900 sm of Class A office space, a 400-key, five-star hotel, 55 condominiums, and 8,550 sm of retail space. The architects are designing the tower with multi-story atriums and a high-performance curtain wall to bring daylight deep into the building, thereby creating deeper lease spans. The project is currently finishing design.

| Feb 11, 2011

Two projects seek to reinvigorate Los Angeles County medical center

HMC Architects designed two new buildings for the Los Angeles County Martin Luther King, Jr., Medical Center as part of a $360 million plan to reinvigorate the campus. The buildings include a 120-bed hospital, which involves renovation of an existing tower and several support buildings, and the construction of a new multi-service ambulatory care center. The new facilities will have large expanses of glass at all waiting and public areas for unobstructed views of downtown Los Angeles. A curved glass entrance canopy will unite the two buildings. When both projects are completed—the hospital in 2012 and the ambulatory care center in 2013—the campus will have added more than 460,000 sf of space. The hospital will seek LEED certification, while the ambulatory care center is targeting LEED Silver.

| Feb 11, 2011

Sustainable community center to serve Angelinos in need

Harbor Interfaith Services, a nonprofit serving the homeless and working poor in the Harbor Area and South Bay communities of Los Angeles, engaged Withee Malcolm Architects to design a new 15,000-sf family resource center. The architects, who are working pro bono for the initial phase, created a family-centered design that consolidates all programs into a single building. The new three-story space will house a resource center, food pantry, nursery and pre-school, and administrative offices, plus indoor and outdoor play spaces and underground parking. The building’s scale and setbacks will help it blend with its residential neighbors, while its low-flow fixtures, low-VOC and recycled materials, and energy-efficient mechanical equipment and appliances will help it earn LEED certification.

| Feb 11, 2011

Texas megachurch inspired by yesteryear’s materials, today’s design vocabulary

The third phase of The First Baptist Church of Pasadena, Texas, involves construction of a new 115,000-sf worship center addition. Currently in design by Zeigler Cooper, the project will include a 2,500-seat worship center (with circular layout and space for a 50-person orchestra and 200-person choir), a 500-seat chapel (for weddings, funerals, and special events), and a prayer room. The addition will connect to the existing church and create a Christian Commons for education, administration, music, and fellowship. The church asked for a modern design that uses traditional materials, such as stone, brick, and stained glass. Construction is scheduled to begin this summer.

| Feb 11, 2011

Apartment complex caters to University of Minnesota students

Twin Cities firm Elness Swenson Graham Architects designed the new Stadium Village Flats, in the University of Minnesota’s East Bank Campus, with students in mind. The $30 million, six-story residential/retail complex will include 120 furnished apartments with fitness rooms and lounges on each floor. More than 5,000 sf of first-floor retail space and two levels of below-ground parking will complete the complex. Opus AE Group Inc., based in Minneapolis, will provide structural engineering services.

| Feb 11, 2011

Four-story library at Salem State will hold half a million—get this—books!

Salem State University in Massachusetts broke ground on a new library and learning center in December. The new four-story library will include instructional labs, group study rooms, and a testing center. The modern, 124,000-sf design by Boston-based Shepley Bulfinch includes space for 500,000 books and study space for up to a thousand students. Sustainable features include geothermal heating and cooling, rainwater harvesting, and low-flow plumbing fixtures.

| Feb 11, 2011

Green design, white snow at Egyptian desert retail complex

The Mall of Egypt will be a 135,000-sm retail and entertainment complex in Cairo’s modern 6th of October district. The two-story center is divided into three themed zones—The City, which is arranged as a series of streets lined with retail and public spaces; The Desert Valley, which contains upscale department stores, international retailers, and a central courtyard for music and other cultural events; and The Crystal, which will include leisure and entertainment venues, including a cinema and indoor snow park. RTKL is designing the massive complex to LEED Silver standards.

| Feb 10, 2011

7 Things to Know About Impact Glazing and Fire-rated Glass

Back-to-basics answers to seven common questions about impact glazing and fire-rated glass.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021