flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Employers at risk when using construction equipment not sized for women

Contractors

Employers at risk when using construction equipment not sized for women

As more women enter male-dominated fields, gear supply has not kept up with demand.


By Peter Fabris, Contributing Editor | April 8, 2019
Employers at risk when using construction equipment not sized for women

Photo: Pixabay

Poorly fitting equipment is a leading cause of injury in service members, according to a recent Department of Defense report.

The military has had difficulty supplying women with correctly fitted equipment, and construction companies face the same challenge. Ill-fitting gear can pose safety risks including snagging on ladders and exposing the body to hazards.

Companies that don’t address the issue also risk losing workers they try hard to attract and retain, and they could expose themselves to lawsuits for injuries or for failing to provide equal opportunity if a lack of equipment means a woman can’t do her job.

According to a review of more than 330 union contracts in the last five years by Bloomberg Law, provisions on personal protective equipment were included but none included language covering gender-specific gear. One expert says employers should put pressure on equipment vendors to supply appropriately fitted gear for women.

Related Stories

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 4, 2012

San Antonio animal hospital earns LEED Platinum certification

Middleman Construction Company builds the city?s first commercial building to earn certification.

| Apr 4, 2012

Hason joins RNL’s as MENA regional director

Hason specializes in planning and urban design, hospitality, office, corporate headquarters and transportation structures, as well as, higher education and museum facilities.

| Apr 3, 2012

Product Solutions

Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.

| Apr 3, 2012

AIA: Commercial Flooring

Laying the foundation for good design.

| Apr 3, 2012

Blaine Brownell on innovative materials applications in architecture

Brownell, who was named a BD+C 40 Under 40 in 2006, provides insight regarding emerging material trends and the creative implementation of materials.

| Apr 3, 2012

AGC Glass to reopen shuttered plant

Shuttered since 2008, the plant produces clear and tinted float glass serving architectural glass markets.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Apr 3, 2012

SSOE acquires MEP Firm CRS Engineering & Design Consultants

The acquisition will expand SSOE’s Southeastern U.S. presence, broaden CRS’s reach to international markets, and provide both firms’ clients access to enhanced services and resources.

| Apr 3, 2012

Suffolk completes phase one of Baystate Medical Center expansion

Construction management firm awarded emergency department project for successful build of $296 million MassMutual Wing and Davis Family Heart and Vascular Center.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021