flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EMerge Alliance forms new Campus Microgrid Technical Standards Committee

EMerge Alliance forms new Campus Microgrid Technical Standards Committee

Intel leading the charge to connect multiple DC microgrids throughout commercial buildings; others invited to join effort.


By Posted by Tim Gregorski, Senior Editor | May 17, 2012

The EMerge Alliance – an open industry association leading the rapid adoption of safe direct-current (DC) power distribution standards for commercial buildings – today announced the formation of a new Campus Microgrid Technical Standards Committee at the American Institute of Architects (AIA) 2012 National Convention and Design Exposition.

Chaired by Guy AlLee, of Intel’s Energy Research and Sustainability Labs, the new committee will focus on establishing a standard for the integration of DC microgrids throughout a building or campus.  The standard will focus on improved efficiency of integrated on-site power generation, storage, distribution and use by capitalizing on the utilization of native DC power. With input from member organizations, the new Campus Microgrid standard will integrate the other EMerge Alliance standards that enable the use of DC power at various levels and in a variety of spaces. The resulting set of standards will further advance the Alliance’s mission to help building designers and owners achieve greater flexibility, sustainability and savings.

According to EMerge Alliance Chairman Brian Patterson, the Alliance has been working toward a vision of DC microgrids in four key areas – occupied spaces, data and telecommunications centers, building services and outdoor applications – since the organization was founded in 2008. 

The Campus Microgrid Technical Standards Committee is open to all Alliance members at the Governing and Participating levels, and will include consideration of power, infrastructure, peripheral device and control applications required to operate a building using DC power. The group is inviting other innovative organizations in the commercial building industry to join and contribute to this groundbreaking standards development effort. +

Related Stories

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

| Feb 16, 2012

TLC Engineering for Architecture opens Chattanooga office

TLC Engineering for Architecture provides mechanical, electrical, structural, plumbing, fire protection, communication, technology, LEED, commissioning and energy auditing services.

| Feb 16, 2012

Summit Design + Build begins build-out for Emmi Solutions in Chicago

The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.

| Feb 16, 2012

Highland named president of McCarthy Building Companies’ California region

Highland moved into this new role in January 2012 following a six-month transition period with Carter Chappell, the company’s former president, California region.

| Feb 16, 2012

Big-box retailers not just for DIYers

Nearly half of all contractor purchases made from stores like Home Depot and Lowe's.

| Feb 16, 2012

4.8-megawatt solar power system completed at Jersey Gardens Mall

Solar array among the largest rooftop systems in North America.

| Feb 15, 2012

Fourth-generation Ryan to lead Ryan Companies AE team

Ryan leads a team of eight architects, four civil engineers, two landscape architects and two virtual building specialists in their efforts to realize their customer’s vision and needs through Ryan’s integrated project delivery system.

| Feb 15, 2012

NAHB sees gradual improvement in multifamily sales for boomers

However, since the conditions of the current overall housing market are limiting their ability to sell their existing homes, this market is not recovering as quickly as might have been expected.

| Feb 15, 2012

Skanska secures $87M contract for subway project

The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.

| Feb 15, 2012

Code allowance offers retailers and commercial building owners increased energy savings and reduced construction costs

Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021