MySmartPlans is a relatively new software tool that uses Internet-enabled collaboration to make project-related activities transparent and ensure that current documentation is conveniently accessible to all responsible parties on a project.
To date, $5.2 billion worth of live projects have used MySmartPlans, including more than 100 projects in 22 states. General contractor JE Dunn has used the software on more than 40 projects, including a $740 million project for the U.S. General Services Administration.
MySmartPlans is a hybrid document management tool that updates itself when connected to the Internet but also provides document access even when an online connection is not available. It was launched in 2007 by Marathon Digital Services, Kansas City, Mo., the brainchild of Dominick and Shelley Armato, he the owner of a well-established commercial painting contractor firm, she a commercial real estate broker.
Two features set MySmartPlans apart from other document sharing solutions. First, each project is assigned a dedicated project information manager who continually monitors documents posted by Building Team members and other project participants to make sure the documents are properly labeled and filed. The project information manager also checks all documents for organization, completeness, and accuracy; adds bookmarks and creates links to related documents; and optimizes each document so it takes up minimal space and is compiled in a standardized, easily opened format.
The other distinguishing feature is MySmartPlansā closeout dashboard, which has turned out to be very popular with users. Documents are organized according to CSI divisions and can be accessed through an online dashboard, which is also monitored by the project information manager. Based on a customizable template, the dashboard can include additional resources like an embedded Google map of the project location.
How two building teams are using the software
The National Nuclear Security Administration Campus, in Kansas City, Mo., and the University of MissouriāKansas City, were among the early adopters of MySmartPlans.
The NNSA Campus project, a public-private partnership, encompasses $540 million in hard construction costs, $200 million in associated soft costs, and $250 million in manufacturing machinery relocation expenses. The project will replace a 60-year-old manufacturing plant with a new 1.5-million-sf, LEED Gold facility that will house 2,500 workers, who will manufacture non-nuclear mechanical, electronic, and engineered materials for national defense systems.
Seven ways to build smart
- Be prepared. Because the MySmartPlans project information manager goes through every document posted on the dashboard to make sure it is optimized, complete, and properly identified, you wonāt find yourself missing pages in the middle of a project meeting.
- Simplify your filing. All project documentationādrawings, review comments, meeting minutes, project schedules, contact informationāis available through the MySmartPlans dashboard, organized by CSI division. That means you no longer need to organize and file project-related documents.
- Save money. Reproduction costs and associated delivery charges drop significantly.
- Save time. Because they are being assembled throughout the life of the project, closeout documents are available almost immediately upon completion. No more waiting six months or more to get the manuals for those VAV boxes.
- Avoid interruptions. UMKCās Greg Silkman says, āI give our clients access to the dashboard. They donāt have to rely on me for updates because current information is available on the dashboard and they can access it when it is convenient for them.ā
- Stop digging through file cabinets for obscure submittals. They are right there on the dashboard.
- Point and click for information. SmartRoomsāphotos with links to various features and pieces of equipmentālets you go straight to the associated documentation with one click. Itās a standard feature; thereās no extra charge.
It is being constructed under the auspices of the General Services Administration for NNSA and developer/lessor CenterPoint Zimmer LLC, an entity consisting of CenterPoint Properties, Oak Brook, Ill., and Zimmer Real Estate Services, Kansas City, Mo. The Building Team consists of HNTB, SSOE, Johnson Controls, and JE Dunn Construction, with Gastinger Walker Harden Architects as a consultant to GSA.
GSAās Project Manager, Doug Benton, PE, learned about MySmartPlans a few years ago and invited Shelley Armato to demonstrate it to GSA staff. Benton then recommended the collaboration tool to the developer, who contracted for its use.
Benton even took the unusual step of obtaining security clearance for Marathon staff to work inside GSAās firewall exclusively for this project. āInitially, the primary thing being exchanged was design information, like CAD data files that tend to be in the range of 100 MB,ā says Benton. Such Internet capabilities were far beyond any he had available on previous projects.
Early in the design process, NNSA, as the tenant, put together an extensive list of requirements for the project, including a database with thousands of pieces of manufacturing equipment that eventually would have to be relocated from the old facility to the new one.
The design-build development team began by designing the facility, concurrently modeling it in Autodesk Revit. That model then went to the GC, JE Dunn, which worked with the subcontractors to build everything in 3D in the construction modelāāagain, before any physical construction had begun. That process enabled engineers and construction managers sitting in a CAD war room to work out all the construction interference issues before the structural elements went into fabrication.
The mechanical contractor, US Engineering, set up shop across the road from the construction, downloading the data into CNC machines, fabricating ductwork based on the computer model, and making the shipping of even large pipes and ductwork easy and cost-effective. Furthermore, with dimensions coming right out of the virtual model, the piping and ductwork can be fabricated in a shop environment at a much lower cost and with much better quality control than can be done on site by hand.
The NNSA project now has more than a thousand registered users, representing about 175 organizations, mostly construction subcontractors. Benton notes that this is the first GSA lease project to use an online collaboration tool to such an extent. He credits much of the success in collaborating on this project to being able to use the Internet so effectively.
Benton says the project is coming in on schedule and within budget. NNSA expects to begin moving into its new Kansas City campus in January. Upon completion of the project in 2014, all of the construction documentation will be assembled in a closeout package and turned over to the NNSAās operations and maintenance personnel.
Seeking long-term payoff at UMKC
The University of MissouriāKansas City has used MySmartPlans on a variety of projects. Greg Silkman, UMKCās Manager of Planning, Design and Construction, was introduced to MySmartPlans about four years ago. At first, he liked its potential as a maintenance tool but was not convinced it would work on a major design project.
As a test, Marathon created a closeout dashboard based on the as-built project documents for a recently completed university project. When Silkman showed the dashboard to his maintenance supervisors, they agreed that MySmartPlans would improve their ability to maintain campus buildings.
Since then the university has completed a dozen or so projects using MySmartPlans for design as well as construction, most recently for a 1,500-space, $26.3 million parking garage. The five-level structure, which opened in September, provides a pathway to the UMKC Volker Campus and relocates the campus police station. Elevated bridges offer pedestrian access to the student union and performing arts center. The Building Team consisted of BNIM, Walker Parking Consultants, and JE Dunn Construction.
āMySmartPlans is a huge benefit for construction,ā Silkman says. āBut the biggest benefit of using it is for the life of the building, which could be 60 to 100 years.ā +
Related Stories
Multifamily Housing | Apr 7, 2022
Ken Soble Tower becomes worldās largest residential Passive House retrofit
The project team for the 18-story high-rise for seniors slashed the buildingās greenhouse gas emissions by 94 percent and its heating energy demand by 91 percent.
Architects | Apr 7, 2022
Perkins Eastman, Kliment Halsband Architects to merge
Perkins Eastman and Kliment Halsband Architects have announced their merger, which will combine the formidable talents, experience, and skills of both legacy firms. With Perkins Eastman celebrating its 40th anniversary and Kliment Halsband celebrating its 50th, this merger promises to create powerful synergies.
Urban Planning | Apr 5, 2022
The art of master planning, with Mike Aziz of Cooper Robertson
Mike Aziz, AIA, LEED AP, Partner and Director of Urban Design with Cooper Robertson, discusses his firm's design for the redevelopment of a Connecticut town's riverfront.
Multifamily Housing | Apr 5, 2022
New Covenant House New York contains multiple services for youth in crisis
The new Covenant House New York, a crisis shelter for homeless youth in the Hellās Kitchen neighborhood, provides a temporary home and multiple services for young people.
Sponsored | BD+C University Course | Apr 1, 2022
Video surveillance systems for multifamily housing projects
This introductory course provides detailed technical information and advice from security expert Michael Silva, CPP, on designing a video surveillance system for multifamily housing communities ā apartments, condominiums, townhouses, or senior living communities. Technical advice on choosing the right type of cameras and optimizing the exterior lighting for their use is offered.
K-12 Schools | Apr 1, 2022
Charleston Countyās award-winning career and technical education high school
BD+C Executive Editor Rob Cassidy talks with the team behind the award-winning Cooper River Center for Advanced Studies, a Career|Technical Education high school in Charleston County, S.C.
Modular Building | Mar 31, 2022
Rick Murdockās dream multifamily housing factory
Modular housing leaderĀ Rick Murdock had a vision: Why not use robotic systems to automate the production of affordable modular housing? Now that vision is a reality.
Multifamily Housing | Mar 29, 2022
Hereās why the U.S. needs more āTODā housing
Transit-oriented developments help address the housing affordability issue that many cities and suburbs are facing.
Contractors | Mar 28, 2022
Amid supply chain woes, building teams employ extreme procurement measures
Project teams are looking to eliminate much of the guesswork around product availability and price inflation by employing early bulk-purchasing measures for entire building projects.
Reconstruction & Renovation | Mar 28, 2022
Is your firm a reconstruction sector giant?
Is your firm active in the U.S. building reconstruction, renovation, historic preservation, and adaptive reuse markets? We invite you to participate in BD+C's inaugural Reconstruction Market Research Report.