Wayne J. Griffin Electric, Inc. (Griffin Electric) has recently completed the electrical installation work at the updated Rhode Island Division of Motor Vehicles (DMV) facility in Cranston, RI.
The facility was renovated in order to better the working environment for DMV employees and streamline the experience for Rhode Island drivers. The 78,000-sf building features many earth-friendly attributes, including high-efficiency mechanical systems and daylight dimming sensors, plus incorporates green building materials such as bamboo and recycled carpeting. For the convenience of drivers, the many types of DMV transactions were distributed on three floors, and enhanced waiting and concession areas were created.
Griffin Electric was responsible for installing new power distribution within the building, in addition to systems for tele/data, security and fire notification. Providence-based Dimeo Construction Co. was the General Contractor on-site, while Lerner Ladds + Bartel, also of Providence, served as the project Architect, and Creative Environment Corp. Consulting Engineers of East Providence was the Electrical Engineer.
“There are an increasing number of projects awarded to us which are built within the LEED certification parameters,” commented Wayne J. Griffin, President of Griffin Electric. “We are glad to be part of any project that is dedicated to the preservation and sustainability of our environment, through the use of earth-friendly materials and procedures.” BD+C
Related Stories
| Oct 5, 2011
GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011
In a setting composed of reclaimed materials, biodegradable signage, energy-efficient lighting and more, exhibitor highlights its new products with ecological awareness.
| Oct 5, 2011
GREENBUILD 2011: Brick offers growing options for sustainable building design
Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification.
| Oct 5, 2011
GREENBUILD 2011: Roof hatch designed for energy efficiency
The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance.
| Oct 4, 2011
GREENBUILD 2011
Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.
| Sep 29, 2011
Kohler supports 2011 Solar Decathlon competition teams
Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.
| Sep 28, 2011
GBCI announces LEED fellow class of 2011
LEED Fellows represent green building industry's most accomplished professionals.
| Sep 28, 2011
Opus Group awarded contract for new Church & Dwight Co. headquarters
The campus will include two 125,000-sf Class A, energy-efficient office buildings that will be designed and constructed with sustainable practices and elements.
| Sep 23, 2011
Okanagan College sets sights on Living Buildings Challenge
The Living Building Challenge requires projects to meet a stringent list of qualifications, including net-zero energy and water consumption, and address critical environmental, social and economic factors.
| Sep 23, 2011
Under 40 Leadership Summit
Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.
| Sep 16, 2011
Largest solar installation completed at Redskins' football stadium
On game days, solar power can provide up to 20% of FedExField’s power.