flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Efficient material design, low-carbon concrete are critical to cutting GHG emissions in construction

Codes and Standards

Efficient material design, low-carbon concrete are critical to cutting GHG emissions in construction

Enhancing building utilization and reusing materials also aid carbon reduction.


By Peter Fabris, Contributing Editor | October 22, 2019

Courtesy Pixabay

Efficient material design and the use of low-carbon concrete are crucial to efforts to reduce greenhouse gas emissions (GHG) during the construction process, according to a report from C40 Cities, Arup, and the University of Leeds.

Eliminating material waste at the design stage could lead to an 18% reduction of GHG emissions between 2017 and 2050, the report says. The production of cement requires extreme heat and releases a great deal of CO2. The report says that using low-carbon alternatives to traditional cement could cut GHG emissions by 6% between 2017 and 2050.

Reusing building materials and components such as structural steel could achieve a 3% GHG reduction by 2050. Making better use of buildings can also make a dent in GHG emissions.

“Buildings are [underutilized] and often discarded before they have reached the end of their useful life,” the report says. Implementing strategic use of existing space and infrastructure can lead to an 11% GHG emission reduction by 2050, and a 10%-20% reduction in demand for new buildings.

Another GHG-reduction strategy is to switch high-emission materials to sustainable timber. That could reduce emissions by 6% by 2050.

Related Stories

Codes and Standards | May 20, 2019

Property lenders shouldn’t invest for 30 years in most of Florida, expert warns

Climate ignorance driving some ‘insane’ deals.

Codes and Standards | May 17, 2019

NIMBYism is the biggest multifamily construction barrier

National Apartment Assn. report assesses reasons for difficulty in creating more apartments.

Codes and Standards | May 17, 2019

Dept. of Energy to award up to $33.5 million for advanced construction R&D

Focus is on techniques to reduce energy bills.

Codes and Standards | May 16, 2019

Mixed reviews on targeted tax break for San Francisco neighborhood

“Twitter tax break” may have worsened some of the area’s problems.

Codes and Standards | May 15, 2019

OSHA inspections to increase, says Secretary of Labor

Newly hired inspectors getting up to speed.

Codes and Standards | May 14, 2019

Database records more than 1,360 K-12 school shooting incidents since 1970

Naval Postgraduate School program maps locations nationwide.

Codes and Standards | May 13, 2019

In many cities, downtown housing comes with a hefty premium

Urban core living costs hundreds of thousands more in largest U.S. cities.

Codes and Standards | May 7, 2019

San Francisco plan would require largest commercial buildings to use 100% renewable electricity

First in the U.S. mandate would be phased in from 2022 to 2030.

Codes and Standards | May 7, 2019

ABC says best practices can improve construction companies’ safety by 680%

Daily ‘toolbox safety talks’ were most effective safety measures.

Codes and Standards | May 7, 2019

Office noise significantly reducing employee concentration, productivity, and creativity

Workplace distractions cause some to choose to work remotely.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021