flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.


By By Robert Cassidy | September 26, 2012

The November issue of Building Design+Construction will feature a “progress report on sustainable design and construction” with a look to the top projects in key green building categories – and how AEC firms are keeping on top of sustainability issues.

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

Please respond to Rob Cassidy, Editorial Director: rcassidy@sgcmail.com, or 847-391-1040. We need to hear from you by Friday, Oct. 5, 2012.

Tell us what your firm is doing in sustainability that’s fresh and innovative: Using propriety environmental software? Energy modeling? Strategic planning around sustainability? Advocacy? New “green” building materials? Renewables? Net-zero? Living Buildings? Performance measurement? Human/social benefit of green building? Meeting heightened client demands for sustainability? Overcoming cost or regulatory barriers? Going beyond “point counting”? Marketing green?

Send us press releases, photo/s or renderings (low-res), PDFs, etc. – about your firm’s recent green projects (last 12-18 months).Projects could fall into several areas: LEED (minimum Gold or Platinum), Green Globes, CHPS, Living Building Challenge, Zero/Net-Zero Energy/Water/Waste, etc. – for New Construction, Renovation, Existing Buildings, Commercial Interiors, etc.
We are particularly interested in projects in the following categories:

  • Healthcare Facilities (hospitals, EDs, MOBs, outpatient, specialty facilities)
  • K-12 Schools (public, private, charter, Pre-K too)
  • University Projects (residence halls, student unions, classroom buildings, S+T, etc.)
  • Office Buildings (new, reconstructed – major fitouts)
  • Reconstruction Projects (historic preservation, adaptive reuse, reconstruction with addition, major renovations and fitouts)
  • Hotel/Hospitality/Restaurant Projects
  • Retail Projects (mixed-use, malls, shopping centers, stores)
  • Government Buildings (Fed, State, Local)
  • Multifamily (rental apartment, condo, townhouse complex – no single-family)
  • Military Projects (base facilities, offices, base Xchange, etc.)
  • Data Centers and Mission-Critical Facilities
  • BIM/VDC/CAD-based Projects that are also sustainably designed (did BIM help?)

Who is the key “sustainability” expert at your firm? (Name, title, contact info)

Thanks, and we look forward to working with you on this exciting issue of BD+C! +

Related Stories

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

| Jun 7, 2013

Must see: Building façade made of massive concrete drain pipes

Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.

| Jun 7, 2013

40 Under 40 retrospective: Where are they now?

Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.

| Jun 7, 2013

First look: University of Utah's ‘teaching hospital for law’

The University of Utah broke ground on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.

| Jun 7, 2013

First look: Austin breaks ground on 'light-filled' Central Library

The design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.

| Jun 5, 2013

Survey of AE firms shows profits, hiring on the rise

A recent survey of more than 40 Boston-area architecture and engineering companies by consulting firm DiCicco, Gulman & Company confirms continued growth in business volume.

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

| Jun 4, 2013

Notification reinvented: SimplexGrinnell introduces revolutionary family of intelligent notification appliances

Simplex TrueAlert ES uses addressable technology to improve protection, simplify installation and reduce operating costs.

| Jun 3, 2013

6 residential projects named 'best in housing design' by AIA

The Via Verde mixed-use development in Bronx, N.Y., and a student housing complex in Seattle are among the winners of AIA's 2013 Housing Awards.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021