flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.


By By Robert Cassidy | September 26, 2012

The November issue of Building Design+Construction will feature a “progress report on sustainable design and construction” with a look to the top projects in key green building categories – and how AEC firms are keeping on top of sustainability issues.

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

Please respond to Rob Cassidy, Editorial Director: rcassidy@sgcmail.com, or 847-391-1040. We need to hear from you by Friday, Oct. 5, 2012.

Tell us what your firm is doing in sustainability that’s fresh and innovative: Using propriety environmental software? Energy modeling? Strategic planning around sustainability? Advocacy? New “green” building materials? Renewables? Net-zero? Living Buildings? Performance measurement? Human/social benefit of green building? Meeting heightened client demands for sustainability? Overcoming cost or regulatory barriers? Going beyond “point counting”? Marketing green?

Send us press releases, photo/s or renderings (low-res), PDFs, etc. – about your firm’s recent green projects (last 12-18 months).Projects could fall into several areas: LEED (minimum Gold or Platinum), Green Globes, CHPS, Living Building Challenge, Zero/Net-Zero Energy/Water/Waste, etc. – for New Construction, Renovation, Existing Buildings, Commercial Interiors, etc.
We are particularly interested in projects in the following categories:

  • Healthcare Facilities (hospitals, EDs, MOBs, outpatient, specialty facilities)
  • K-12 Schools (public, private, charter, Pre-K too)
  • University Projects (residence halls, student unions, classroom buildings, S+T, etc.)
  • Office Buildings (new, reconstructed – major fitouts)
  • Reconstruction Projects (historic preservation, adaptive reuse, reconstruction with addition, major renovations and fitouts)
  • Hotel/Hospitality/Restaurant Projects
  • Retail Projects (mixed-use, malls, shopping centers, stores)
  • Government Buildings (Fed, State, Local)
  • Multifamily (rental apartment, condo, townhouse complex – no single-family)
  • Military Projects (base facilities, offices, base Xchange, etc.)
  • Data Centers and Mission-Critical Facilities
  • BIM/VDC/CAD-based Projects that are also sustainably designed (did BIM help?)

Who is the key “sustainability” expert at your firm? (Name, title, contact info)

Thanks, and we look forward to working with you on this exciting issue of BD+C! +

Related Stories

| Aug 20, 2013

40 Under 40 retrospective: ‘U40s’ take on continuing ed, snake’s blood

Every month we’ll be touching base with past 40 Under 40 honorees to see what’s been happening in their professional and personal lives since winning the award. This month: An accomplished author of test-prep books and an architect who headed to China when the American economy turned sour.

| Aug 20, 2013

Top Data Center Architecture Firms [2013 Giants 300 Report]

Corgan, Gensler, HDR head Building Design+Construction's 2013 ranking of the largest data center architecture and architecture/engineering firms in the U.S.

| Aug 20, 2013

First look: $550 million Billie Jean King National Tennis Center renovation

The United States Tennis Association has announced its plans for a sweeping transformation of the USTABillie Jean King National Tennis Center that will include the construction of two new stadiums, as well as a retractable roof over Arthur Ashe Stadium.  The transformation will be implemented in three phases to begin at the conclusion of the 2013 US Open, with the goal of overall completion by the 2018 US Open.

| Aug 15, 2013

Design-build project delivery holds steady at nearly 40% of nonresidential construction: DBIA study

The Design-Build Institute of America (DBIA), the only organization that defines, teaches and promotes best practices in design-build, has released research indicating that design-build project delivery represents nearly 40 percent of total market share in the United States, based on dollar value at the end of 2012. 

| Aug 14, 2013

Five projects receive 2013 Educational Facility Design Excellence Award

The American Institute of Architects (AIA) Committee on Architecture for Education (CAE) has selected five educational and cultural facilities for this year’s CAE Educational Facility Design Awards.

| Aug 14, 2013

Sluggish gains in architect compensation due to weakness in construction sector: AIA survey

U.S. architecture firms have experienced modest improvements in business conditions over the last two years that has resulted in very small gains in compensation levels for staffs. 

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Aug 13, 2013

DPR's Phoenix office, designed by SmithGroupJJR, affirmed as world's largest ILFI-certified net-zero facility

The new Phoenix Regional Office of DPR Construction, designed by SmithGroupJJR, has been officially certified as a Net Zero Energy Building by the International Living Future Institute (ILFI).  It’s the largest building in the world to achieve Net Zero Energy Building Certification through the Institute to date.

| Aug 8, 2013

Energy research animates science sector [2013 Giants 300 Report]

After an era of biology-oriented spending—largely driven by Big Pharma and government concerns about bioterrorism—climate change is reshaping priorities in science and technology construction.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021