flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.


By By Robert Cassidy | September 26, 2012

The November issue of Building Design+Construction will feature a “progress report on sustainable design and construction” with a look to the top projects in key green building categories – and how AEC firms are keeping on top of sustainability issues.

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

Please respond to Rob Cassidy, Editorial Director: rcassidy@sgcmail.com, or 847-391-1040. We need to hear from you by Friday, Oct. 5, 2012.

Tell us what your firm is doing in sustainability that’s fresh and innovative: Using propriety environmental software? Energy modeling? Strategic planning around sustainability? Advocacy? New “green” building materials? Renewables? Net-zero? Living Buildings? Performance measurement? Human/social benefit of green building? Meeting heightened client demands for sustainability? Overcoming cost or regulatory barriers? Going beyond “point counting”? Marketing green?

Send us press releases, photo/s or renderings (low-res), PDFs, etc. – about your firm’s recent green projects (last 12-18 months).Projects could fall into several areas: LEED (minimum Gold or Platinum), Green Globes, CHPS, Living Building Challenge, Zero/Net-Zero Energy/Water/Waste, etc. – for New Construction, Renovation, Existing Buildings, Commercial Interiors, etc.
We are particularly interested in projects in the following categories:

  • Healthcare Facilities (hospitals, EDs, MOBs, outpatient, specialty facilities)
  • K-12 Schools (public, private, charter, Pre-K too)
  • University Projects (residence halls, student unions, classroom buildings, S+T, etc.)
  • Office Buildings (new, reconstructed – major fitouts)
  • Reconstruction Projects (historic preservation, adaptive reuse, reconstruction with addition, major renovations and fitouts)
  • Hotel/Hospitality/Restaurant Projects
  • Retail Projects (mixed-use, malls, shopping centers, stores)
  • Government Buildings (Fed, State, Local)
  • Multifamily (rental apartment, condo, townhouse complex – no single-family)
  • Military Projects (base facilities, offices, base Xchange, etc.)
  • Data Centers and Mission-Critical Facilities
  • BIM/VDC/CAD-based Projects that are also sustainably designed (did BIM help?)

Who is the key “sustainability” expert at your firm? (Name, title, contact info)

Thanks, and we look forward to working with you on this exciting issue of BD+C! +

Related Stories

Healthcare Facilities | Mar 16, 2015

Healthcare planning in a post-ACA world: 3 strategies for success

Healthcare providers are seeking direction on how to plan for a value-based world while still very much operating in a volume-based market. CBRE Healthcare's Curtis Skolnick offers helpful strategies. 

Resort Design | Mar 16, 2015

Giancarlo Zema Design Group unveils plans for semi-submerged resort in Qatar

The resort will have four semi-submerged hotels that look similar to super-yachts, each including 75 luxury suites with private terraces.

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

Contractors | Mar 13, 2015

Construction materials prices rise for first time in six months

The largest monthly gain in petroleum prices in over three years caused construction materials prices to expand 0.4% in February, ending a six-month streak when prices failed to rise, according to the Bureau of Labor Statistics.

High-rise Construction | Mar 12, 2015

Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul

If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.

High-rise Construction | Mar 12, 2015

Foster and Partners designs 'The One' in Toronto

Developer Sam Mizrahi worked with Foster and Partners and Core Architects to design Toronto's tallest skyscraper aside from the CN Tower, The One, which will house a luxury shopping mall and condos.

Contractors | Mar 12, 2015

Construction demand exploding in 2015, but costs complicate recovery

Raw materials and labor costs temper expectations for soaring profits.

Codes and Standards | Mar 12, 2015

Energy Trust of Oregon offers financial incentives for net-zero buildings

The organization is offering technical assistance along with financial benefits.

BIM and Information Technology | Mar 11, 2015

Google plans to use robots, cranes to manipulate modular offices at its new HQ

Its visions of “crabots” accentuate the search-engine giant’s recent fascination with robotics and automation.

Sports and Recreational Facilities | Mar 11, 2015

Foster + Partners wins bid for 2022 World Cup centerpiece stadium in Qatar

Norman Foster described the design as “an exciting step forward in stadium design—it will be the first to break the mold of the free-standing suburban concept, and instead anticipates the grid of this future city.” 

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


University Buildings

Des Moines University Medicine and Health Sciences opens a new 88-acre campus

Des Moines University Medicine and Health Sciences has opened a new campus spanning 88 acres, over three times larger than its previous location. Designed by RDG Planning & Design and built by Turner Construction, the $260 million campus features technology-rich, flexible educational spaces that promote innovative teaching methods, expand research activity, and enhance clinical services. The campus includes four buildings connected with elevated pathways and totaling 382,000 sf. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021