As architects and contractors look for ways to develop energy-efficient buildings, Premier SIPS by Insulfoam offer an engaging infographic on how to achieve more airtight, well-insulated structures. The "Be a Zero Hero" infographic (see below) highlights how structural insulated panel construction is 15 times more air tight and offers 47% greater insulation performance than traditional stick framing.
"One thing that surprises many people we speak with, is how affordable net-zero energy construction can be," said Joe Pasma, technical director for Premier SIPS. "The methods exist today and are often straightforward and cost effective, whether for homes, apartments, schools or other institutional and commercial buildings. We wanted to create an easy-to-share graphic that inspires and educates building professionals on uses of available technologies for reducing heating and cooling costs."
Be A Zero Hero: A Simple and Fast Way to Energy Efficient Buildings - An infographic by the Structural Insulated Panels team at PremierSIPs.
About Premier SIPs by Insulfoam
Premier SIPS by Insulfoam leads the construction industry in the research, development and manufacturing of high-performance, energy-efficient structural insulated panels (SIPs) and related materials. As one of North America's largest SIP manufacturers, the company is a leader in working with design professionals, contractors and code officials on innovative SIP applications. For more information about Premier SIPS, call (800) 275-7086 or visit their website.
Related Stories
| Mar 19, 2012
Smith Carter joins forces with Genivar
Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.