As architects and contractors look for ways to develop energy-efficient buildings, Premier SIPS by Insulfoam offer an engaging infographic on how to achieve more airtight, well-insulated structures. The "Be a Zero Hero" infographic (see below) highlights how structural insulated panel construction is 15 times more air tight and offers 47% greater insulation performance than traditional stick framing.
"One thing that surprises many people we speak with, is how affordable net-zero energy construction can be," said Joe Pasma, technical director for Premier SIPS. "The methods exist today and are often straightforward and cost effective, whether for homes, apartments, schools or other institutional and commercial buildings. We wanted to create an easy-to-share graphic that inspires and educates building professionals on uses of available technologies for reducing heating and cooling costs."
Be A Zero Hero: A Simple and Fast Way to Energy Efficient Buildings - An infographic by the Structural Insulated Panels team at PremierSIPs.
About Premier SIPs by Insulfoam
Premier SIPS by Insulfoam leads the construction industry in the research, development and manufacturing of high-performance, energy-efficient structural insulated panels (SIPs) and related materials. As one of North America's largest SIP manufacturers, the company is a leader in working with design professionals, contractors and code officials on innovative SIP applications. For more information about Premier SIPS, call (800) 275-7086 or visit their website.
Related Stories
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.