flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EarthCam Headquarters features a 25-foot-tall video portal entrance

Office Buildings

EarthCam Headquarters features a 25-foot-tall video portal entrance

Watch a time-lapse of the HQ being built from groundbreaking to grand opening.


By David Malone, Associate Editor | May 31, 2018
Exterior of EarthCampus HQ

Courtesy EarthCam

EarthCam went a little meta recently. The company that provides time lapse videos of buildings being constructed all over the world, has provided a time lapse video of its own headquarters building, EarthCampus, being constructed in New Jersey.

Davis Brody Bond in collaboration with Spacesmith designed the space from an old factory with the goal of boosting employee health and collaboration. The architect used stabilized aluminum foam and exposed the organic nature of the translucent panels to create a high-tech glow on the exterior of the building. The façade, which is made from recycled materials, also acts as a sunshield for reduced energy consumption during the day. At night, hundreds of thousands of small openings are backlit by 3,500 custom-manufactured LED lights.

The most striking feature of the new headquarters, however, is the sloping 25-foot-tall video portal that greets employees and visitors upon entry in an almost three-story glass curtain wall atrium. The video portal takes EarthCam’s live video content and turns it into a digital art display. A six-ton blackened steel tunnel serves as a transitional gateway through the video portal into EarthCam’s offices.

 

See Also: Watch a time-lapse of Wrigley Field’s most recent phase of renovations

 

Images from EarthCam’s cameras are used to reinforce the brand in the office space, as well. Custom-printed wallpaper features thousands of images from these cameras to create visual documentation of the company’s 22-year history. The workspace also features floor-to-ceiling windows and a unique 180-foot-long serpentine style desk that joins the programming lab and the creative studio.

EarthCampus’s landscaping features meditation areas, walking paths, bike trails, and the EarthCam Arboretum with over 50 species of flora, all designed by landscape architect James Rose.

Below you can watch a time-lapse created from video captured by over 40 different time-lapse cameras stretching from the groundbreaking ceremony on Sept. 29, 2015 to the grand opening party.

 

Related Stories

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

| Dec 5, 2011

SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando

The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 1, 2011

VLK Architects’ office receives LEED certification

The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021