flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Dutch ‘Windwheel’ wants to create a new sustainable landmark for Rotterdam

Sustainability

The Dutch ‘Windwheel’ wants to create a new sustainable landmark for Rotterdam

The sustainable structure will be a mixed-use development with a hotel, apartments, and office space.


By David Malone, Associate Editor | June 29, 2017

Image courtesy of DoepelStrijkers

Hailed by the Windwheel Corporation as “a true showcase for climate architecture,” the Dutch Windwheel is a unique building focused on being as sustainable as possible while still providing a complete mixed-use development for the city of Rotterdam.

The Windwheel will be outfitted with myriad advanced technological solutions focused on sustainability. An innovation consortium that includes Arup, the Royal BAM Group, Deltares, Dura Vermeer, ECN, Eneco, Evides, Siemens, SPIE and TNO is researching these technologies, some of which are in latter developmental stages, according to Windwheel Corporation.

 

Image courtesy of DoepelStrijkers.

 

Some of the technologies planned for the structure include a smart skin climate zone with natural ventilation and integrated greenery, wind energy and passive cooling, biogas production, a solar façade, and rain water collection. The building will be constructed with materials from the Rotterdam region and is designed to be dynamic and upgradeable after it has been built to stay at the forefront of sustainable innovation.

 

Image courtesy of DoepelStrijkers.

 

The sustainability of the Windwheel is obviously the most important aspect of the building, but that doesn’t mean everything else has been pushed aside. The Windwheel wants to become a mixed-use development and economic boon for the Dutch port city.

“Coaster cabins” will be used to move visitors to the top of the 174-meter-tall building. These coaster cabins will rotate around the building like a ferris wheel and use innovative lighting concepts and digital information layers that act as a virtual tour guide for visitors, pointing out what can be seen and providing information.

 

Image courtesy of DoepelStrijkers.

 

30,000 sm of commercial space, 14,000 sm of apartments, 14,000 sm of short stay space, a 5,700-sm hotel, and a 2,600-sm sky lobby and panorama restaurant will all be included. Visitors will enter the building via a 2,750-sm entrance lobby.

The Windwheel was originally unveiled in 2015, but this most recent look at the structure provides a more detailed look into the buildings sustainable and mixed-use features. Current projections put a completion date for the project between 2022 and 2025.

 

Image courtesy of DoepelStrijkers.

Related Stories

Building Team Awards | Jun 13, 2017

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.

Wood | Jun 6, 2017

Shigeru Ban-designed residential structure poised to become world’s tallest hybrid timber building

The wood, concrete, and glass building will rise approximately 233 feet when finished.

| May 30, 2017

Accelerate Live! talk: Health-generating buildings, Marcene Kinney, Angela Mazzi, GBBN Architects

Architects Marcene Kinney and Angela Mazzi share design hacks pinpointing specific aspects of the built environment that affect behavior, well-being, and performance.

Multifamily Housing | May 22, 2017

Zaha Hadid Architects residential development takes a page from a classic Bradbury tale

The buildings are on an elevated platform and the surrounding walkways are suspended so as not to disturb the surrounding ecosystems.

Sustainability | May 16, 2017

1.5 million recycled plastic bottles were used to build this nine-story structure in Taipei

The building is made of Polli-Brick, a building material that comes from 100% recycled Polyethylene Terephthalate Polymer.

Green | May 2, 2017

Green buildings don't have to cost more

What impact does sustainable design have on owners with a finite construction budget or developers who won’t own the building after construction?

Sustainability | Apr 20, 2017

The American Institute of Architects select the 2017 COTE Top Ten Awards

In its 21st year, the Top Ten Awards highlight projects that exemplify the integration of great design and great performance.

Sustainability | Apr 19, 2017

Embracing the WELL Building Standard: The next step in green

When you consider that 90% of our time is spent in buildings, how these environments can contribute to workplace productivity, health, and wellness is the logical next step in the smart building movement.

Sports and Recreational Facilities | Apr 19, 2017

Mercedes-Benz Stadium delayed until late August

The stadium is now scheduled to open on Aug. 26 in a preseason game between the Falcons and the Jaguars.

Multifamily Housing | Apr 18, 2017

Hanging Gardens-inspired CLT residential development proposed for Birmingham

Garden Hill will provide an ‘oasis-like residence’ for Birmingham’s growing, multicultural student population.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021