Duro-Last Duro-Bond Roofing System installed on New England warehouse

Sponsored Content Roofing

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.


By Duro-Last | May 24, 2017

When one of New England’s premier manufacturing representative agencies purchased a new warehouse, it was clear from the beginning that the building’s existing standing seam roof needed to be replaced before the necessary internal improvements could begin.

The 27,500 square foot building purchased by EDOS Manufacturers’ Reps, Inc. was an existing metal structure with a standing seam metal roof that was severely rusted. The metal pan yielded pull test values of only 180 lbs., which is pushing the lower margin of acceptability by both industry and Duro-Last® engineering standards.

Building owner and President, Robert Os, hired authorized Duro-Last contractor, Breault Roofing of New Bedford, MA, to explore possible solutions. After considering the advantages of each system, Os decided to install the Duro-Last Duro- Bond® Roofing System. This system was viewed as the best option because of key features that set Duro- Last apart from the rest, such as the ability to custom-fabricate the membrane in house; providing edge-to- edge solutions including metals; Duro-Guard® insulation options, and offering a superior warranty.

Thanks to Duro-Last’s custom-fabrication process, the PVC sheets were custom engineered and manufactured to fit this specific project. Being an innovative Duro-Last contractor, Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.

“Purlin fastening meant the Duro-Bond plates were in straight lines. This simplified the installation and allowed the crew to work more quickly and efficiently,” said Scott Bieber, Duro-Last Business Development Manager.

 

 

Upon working with Duro-Last customer service and engineering services teams, Duro-Last was able to provide the contractor with the custom-fabricated tabless sheets with the addition of ridge tabs and eave tabs as requested. This resulted in a timely and efficient metal retrofit that used 10,000 less screws than normally required.

Despite taking place in December in Massachusetts, EDOS office manager, Lori Hamelin said, “There were no issues with business operations. Everything went rather smooth and we were able to stay open.” Os added to this by saying that, “The entire project was extremely well done and quick! The people installing it were great and the entire process was seamless.” Both Os and Hamlin also said they are likely to choose a Duro-Last Roofing System again in the future.

To learn more about the Duro-Bond system and other Duro-Last Roofing Systems contact us today at 800-280- 0280 or www.duro-last.com.

Related Stories

| Apr 5, 2011

SSPC, AISC announce joint standard for paint shop certification

SSPC: The Society for Protective Coatings and the American Institute of Steel Construction (AISC) are pleased to announce a joint certification standard for shop application of protective coatings. The standard, "Certification Standard for Shop Application of Complex Protective Coating Systems," describes requirements for certification of firms that shop apply complex painting systems.

| Mar 10, 2011

Steel Joists Clean Up a Car Wash’s Carbon Footprint

Open-web bowstring trusses and steel joists give a Utah car wash architectural interest, reduce its construction costs, and help green a building type with a reputation for being wasteful.

| Mar 8, 2011

ThyssenKrupp Nirosta, Christian Pohl GmbH supply stainless steel to One World Trade Center

Corners of the One World Trade Center 's facade will be edged with stainless steel made in Germany. ThyssenKrupp Nirosta (Krefeld) produced the material at its Dillenburg plant using a customized rolling and heat-treatment process. Partner company Christian Pohl GmbH (Cologne) fabricated the material into complex facade elements for the corners of the New York City skyscraper. 

| Feb 22, 2011

Military tests show copper increases HVAC efficiency, reduces odors

Recent testing, which is being funded by the Department of Defense, is taking place in military barracks at Fort Jackson, South Carolina. Side-by-side comparisons demonstrate that air conditioning units made with copper suppress the growth of bacteria, mold, and mildew that cause odors and reduce system energy efficiency.

| Dec 17, 2010

Gemstone-inspired design earns India’s first LEED Gold for a hotel

The Park Hotel Hyderabad in Hyderabad, India, was designed by Skidmore, Owings & Merrill to combine inspirations from the region’s jewelry-making traditions with sustainable elements.

| Dec 7, 2010

Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices

IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.

| Nov 5, 2010

New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market

Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.

| Oct 11, 2010

MBMA Releases Fire Resistance Design Guide for metal building systems

The Metal Building Manufacturers Association (MBMA) announces the release of the 2010 Fire Resistance Design Guide for Metal Building Systems. The guide provides building owners, architects, engineers, specifiers, fire marshals, building code officials, contractors, product vendors, builders and metal building manufacturers information on how to effectively meet fire resistance requirements of a project with metal building systems.

| Sep 13, 2010

7 Ways to Economize on Steel Buildings

Two veteran structural engineers give you the lowdown on how to trim costs the next time you build with steel.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021