flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dubai’s newest supertall will be covered in digital displays

High-rise Construction

Dubai’s newest supertall will be covered in digital displays

SOM designed the tower.


By David malone, Associate Editor | February 8, 2019
Looking down on the Burj Jumeira and the surrounding base and retail component

Rendering courtesy Dubai Holding

Dubai Holding has recently unveiled details and renderings for the planned Burj Jumeira, a 550-meter-tall (1,804 feet) tower in Al Sufouh. The tower will be the centerpiece of Downtown Jumeira, a pedestrian friendly mixed-use urban destination.

The tower’s design is inspired by the ripples of the UAE’s desert sand dunes and flowing oases. The façade will be covered with digital displays that can be used to customize the building’s appearance for various occasions and celebrations.

 

Burj Jumeira exterior during the day​Rendering courtesy Dubai Holding.

See Also: AS+GG-designed tower will be the tallest in China

 

The base of the tower is a reflecting pool that can be reconfigured into a staging structure to host various social, cultural, and artistic events and activities. It will feature multiple water fountains and a terraced outdoor amphitheater. A fully integrated retail component will surround Burj Jumeira’s base.

The tower will comprise multiple observation decks that provide 360-degree views of Dubai. The observation decks will include interactive experiences with the main viewing platform accessible via lifts with digital screens that carry the visitor through a distinctive experience until they reach the desired platform.

 

Digital displays lit up on the facade of the Burj Jumeira​Rendering courtesy Dubai Holding.

 

At the Burj Jumeira’s summit is the crown, a 450-meter-high (1,476 feet) space that includes a sky-lounge and interconnected sky-restaurant. The space can be used to host larger scale events and includes similar technologies as the observation decks to create fully immersive and interactive displays.

SOM designed the tower. Completion of the project's first phase is slated for 2023.

 

top of the Burj Jumeira​Rendering courtesy Dubai Holding.

 

Burj Jumeira at duskRendering courtesy Dubai Holding.

 

Rendering courtesy SOM | ATCHAIN.

 

Rendering courtesy SOM | ATCHAIN.

 

Rendering courtesy SOM | ATCHAIN.

Related Stories

High-rise Construction | Feb 17, 2015

Work begins on Bjarke Ingels' pixelated tower in Calgary

Construction on Calgary’s newest skyscraper, the 66-story Telus Sky Tower, recently broke ground. 

Wood | Feb 3, 2015

16 stunning wood buildings win 2015 Wood Design Awards

Jackson Hole (Wyo.) Airport and Stapleton Library in Staten Island, N.Y., are among the projects honored by WoodWorks.

Office Buildings | Jan 27, 2015

London plans to build Foggo Associates' 'can of ham' building

The much delayed high-rise development at London’s 60-70 St. Mary Axe resembles a can of ham, and the project's architects are embracing the playful sobriquet.

| Jan 20, 2015

Avery Associates unveils plans for London's second-tallest tower

The 270-meter tower, dubbed the No. 1 Undershaft, will stand next to the city's "Cheesegrater" building.

| Jan 13, 2015

A new record: 97 buildings taller than 200 meters completed in 2014

Last year was a record-breaking year for high-rise construction, with 97 tall buildings completed worldwide, including 11 "supertalls," according to a new report from the Council on Tall Buildings and Urban Habitat.

| Jan 9, 2015

Technology and media tenants, not financial companies, fill up One World Trade Center

The financial sector has almost no presence in the new tower, with creative and media companies, such as magazine publisher Conde Nast, dominating the vast majority of leased space.

| Dec 28, 2014

Robots, drones, and printed buildings: The promise of automated construction

Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.

| Dec 27, 2014

'Core-first' construction technique cuts costs, saves time on NYC high-rise project

When Plaza Construction first introduced the concept of "core first" in managing the construction of a major office building, the procedure of pouring concrete prior to erecting a steel frame had never been done in New York City.

| Dec 22, 2014

Studio Gang to design Chicago’s third-tallest skyscraper

The first U.S. real-estate investment by The Wanda Group, owned by China’s richest man, will be an 88-story, 1,148-ft-tall mixed-use tower designed by Jeanne Gang.

| Dec 18, 2014

11 new highs for tall buildings: CTBUH recaps the year's top moments in skyscraper construction

The Council on Tall Buildings and Urban Habitat cherrypicked the top moments from 2014, including a record concrete pour, a cautionary note about high-rise development, and two men's daring feat.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021