flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

DSGW Architects welcomes new employees

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.


By Posted by Tim Gregorski, Senior Editor | August 9, 2012

DSGW Architects, a healthcare and hospitality design throughout the Midwest, adds three new employees to support the growth and development of the firm.

Jim Gregory, intern architect, joins DSGW’s Duluth office. He is proficient in Revit and 3-D modeling and is focused on designing hospitality destinations. Jim graduated with a Masters of Architecture at the University of Kansas. While earning his master’s degree, he studied abroad in Germany, Austria and the Czech Republic.

Katherine Gerzina has two years of experience in planning and creating architectural drawings for healthcare clients. She joins the Duluth office as an intern architect to DSGW’s Healthcare Studio. Prior to DSGW, Katherine worked with C. Johnson & Associates in Chicago. She earned her Masters of Architecture at the University of Illinois Chicago.

Corrie Ehrbright also joins the Duluth office. As executive assistant, she will manage office operations and provide support throughout all phases of a project. Corrie graduated with a degree in English from the College of St. Scholastica. +

Related Stories

| Mar 19, 2012

HKS Selected for Baylor Medical Center at Waxahachie

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records. 

| Mar 19, 2012

Mixed-use project redefines Midtown District in Plantation, Fla.

Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC. 

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

| Mar 14, 2012

Plans for San Francisco's tallest building revamped

The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021