flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dream Fields, Lone Star Style

Dream Fields, Lone Star Style

In Texas, student athletic facilities are becoming more and more sophisticated, in response to demographic shifts, safety concerns, and the lure of playoff revenue.


By By Jeff Yoders, Associate Editor | August 11, 2010
This article first appeared in the 200706 issue of BD+C.

How important are athletic programs to U.S. school districts? Here's one leading indicator: In 2005, the National Football League sold 17 million tickets. That same year, America's high schools sold an estimated 225 million tickets to football games, according to the American Football Coaches Association.

In towns and cities across the nation, student athletics are both a thriving industry and a source of community pride. To keep up with demand, public school districts are replacing antiquated facilities with increasingly sophisticated sports complexes that rival, at a somewhat smaller scale, anything to be found in professional venues.

Nowhere is this phenomenon more pronounced than in Texas, where high school athletics has been dramatized in the film and TV series “Friday Night Lights.” Lured by the advertising, gate revenue, and publicity that can be accrued from hosting playoff games and tournaments, school districts and communities in the Lone Star state are creating ever more sophisticated stadiums and athletic facilities.

In Texas, stadiums and athletic centers may serve students from several school districts. They may involve complex partnerships between school districts and city or county governments, or even shared arrangements with professional sports teams. The newest facilities feature such amenities as suites, state-of-the-art press boxes, and the latest artificial turf to guard against injuries to student athletes.



Pizza Hut Park in Frisco, Texas, is the home of the FC Dallas Major League Soccer Team. It's also the home of the home stadium for Frisco Independent School District high school football. The complex also includes 17 championship-quality soccer fields and hosts tournaments and concerts. All photos by HKS/Blake Marvin

“The obvious reason for updating is growth,” said Mark VanderVoort, AIA, SVP of education facilities for Dallas-based architects HKS, Inc., which has worked on five high school stadium projects in the last four years. Older facilities, some dating to the late '40s and '50s, may not have enough seats or enough fields to meet scheduling demands in growing communities, he notes. In some cases, a school district may choose to build a larger facility at a specific high school, or it may build a centralized facility on a separate site for several schools, making it a new focal point for the community.

Partnering with the pros

One of the prime examples of this phenomenon is Pizza Hut Park, home of Major League Soccer's FC Dallas soccer club, and also home to the four different high school football teams in the Frisco Independent School District just north of Dallas. The 21,193-seat stadium, with its 18,500-sf skybox suites and luxury restaurant, is part of a 117-acre complex that takes in 17 championship-quality soccer fields (also shared with the school district), as well as a 300-seat junior varsity football facility with press box and scoreboard.

Completed in late 2005, the HKS-designed complex was created through a four-way deal between Hunt Sports Group (owner of FC Dallas), the city of Frisco and its economic and community development corporations, the Frisco Independent School District, and Collin County.

“The county was looking to build recreational fields for soccer in that area and the school district had already funded and started design work on a new high school football field,” said Craig Stockwell, AIA, principal in charge of the project for HKS. “The city wanted to bring the MLS team there—they were playing at the Cotton Bowl at the time—to create a soccer complex that would also double as a high school football stadium.”

The school district had budgeted $23 million for design and construction of a stadium, but by entering into the public-private partnership, the district was able to get a bigger, better facility for a contribution of only $10 million. The total cost of the complex was $80 million, with Hunt Sports Group contributing $25 million and the city and county picking up the rest of the tab.

The city of Frisco owns the stadium and soccer complex, while HSG manages the facility and books concert dates at it through a deal with Anschutz Entertainment Group. Ancillary revenue from parking, the $25 million Pizza Hut naming rights deal, and concert revenue is shared between HSG and the city/county partnership.

The city and county agreed to let the sports people from HSG make all major design and construction decisions. “Hunt was recognized as the project leader from the outset,” said Stockwell. By creating what Stockwell calls “the ultimate multipurpose facility,” HSG was able book tournaments, playoff games, and numerous other events. “The complex was used 300 days in 2006,” he says. The school district gets the use of the stadium on scheduled Fridays during football season and shares in high school playoff and tournament revenue.

Stockwell said the stadium was intentionally designed with an unobstructed concourse for the nonstop action of soccer, but that design philosophy was also utilized to allow it to be adaptable enough to host concerts for up to 30,000 music fans, high school football games that usually seat around 10,000, U.S. National Soccer Team matches, and the 2005 MLS Cup.

It was also the final stadium project for NFL and National Soccer Hall of Fame member Lamar Hunt, who died last December of complications related to prostate cancer. “He was very involved in the project,” says Stockwell. “He sent us sketches and came to every design presentation and all job site meetings during construction.”

One for all: maximizing revenue, consolidating functions

Pizza Hut Park is used by four different schools in Frisco and shares facilities for both high school football and soccer. Building one facility for several schools in a district is a way to maximize a new facility's revenue potential and create a more sophisticated gathering place that can host playoffs and other events.

The $33 million Dallas Independent School District complex serves 12 high schools in south Dallas and encompasses a 12,000-seat stadium, a 7,500-seat fieldhouse, and shared parking. While it has a high-tech scoreboard, press box, and the newest FieldTurf, it also consolidates support functions such as locker rooms and training facilities. This allows it to be situated on roughly half the site area typically needed for a stadium and fieldhouse of its size, saving the district considerable construction costs.


Midlothian Stadium has offset grandstands near the corners of its field to give a visible performance position to each school's marching band.

“Another driver of these facilities is simply keeping up with the Joneses,” said HKS's VanderVoort. “The Dallas facility was designed to match service capability for a similar complex on the north side of Dallas. But even at its cost of $33 million, there is significant savings for the district here, because it is serving both basketball and football. It's also serving 12 schools, so there's less construction cost for the parking, and the people in south Dallas can now host their own playoff games. It's an expression of how the students and parents feel about themselves and the community of south Dallas.”

The Midlothian Independent School District, another growing community 30 miles south of Dallas, capitalized on a natural setting by building its new $14.2 million football and soccer stadium, completed in late 2006, in a ravine.

What allowed the 8,176-seat bowl to be carved out of a natural ravine were pre-cast concrete mass-stabilized-earth (MSE) retaining walls. The MSE walls, used mostly in highway construction, hold back the ravine walls to form the bowl 12-15 feet above grade. Cheaper than buildi


In addition to a 12,000-seat stadium, the Dallas Independent School District's complex also includes a 7,500-seat fieldhouse.

ng full grandstands, the retaining walls were a cost-effective and sound way to form a natural seating bowl. This results in a design that is “more of a park setting,” says HKS's VanderVoort.

Another nice touch was suggested by the client: locating the seating areas for the bands and drill teams in the corners of the stadium facing the field at a 45-degree angle. “It eliminates the havoc of sitting on the same side as your band and not being able to hear them,” says VanderVoort.”

As at Pizza Hut Park, the Midlothian stadium also uses an open concourse design with four concession stands, plus restrooms situated on the corners of the field. This is a feature HKS is using on nearly all of its stadium projects.

Amenities include 2,000 parking spaces and a two-story press box. The Midlothian school district brought in nearly $90,000 in advertising revenue from the stadium in its first season, in addition to revenue from hosting band competitions and other events.

Related Stories

| May 18, 2011

Improvements add to Detroit convention center’s appeal

Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.

| May 18, 2011

Carnegie Hall vaults into the 21st century with a $200 million renovation

Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.

| Apr 13, 2011

Southern Illinois park pavilion earns LEED Platinum

Erin’s Pavilion, a welcome and visitors center at the 80-acre Edwin Watts Southwind Park in Springfield, Ill., earned LEED Platinum. The new 16,000-sf facility, a joint project between local firm Walton and Associates Architects and the sustainability consulting firm Vertegy, based in St. Louis, serves as a community center and special needs education center, and is named for Erin Elzea, who struggled with disabilities during her life.

| Apr 13, 2011

Expanded Museum of the Moving Image provides a treat for the eyes

The expansion and renovation of the Museum of the Moving Image in the Astoria section of Queens, N.Y., involved a complete redesign of its first floor and the construction of a three-story 47,000-sf addition.

| Apr 12, 2011

Long-awaited San Francisco center is music to jazz organization’s ears

After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood

| Apr 12, 2011

Entrance pavilion adds subtle style to Natural History Museum of Los Angeles

A $13 million gift from the Otis Booth Foundation is funding a new entrance pavilion at the Natural History Museum of Los Angeles County. CO Architects, Los Angeles, is designing the frameless structure with an energy-efficient curtain wall, vertical suspension rods, and horizontal knife plates to make it as transparent as possible.

| Apr 5, 2011

Zaha Hadid’s civic center design divides California city

Architect Zaha Hadid  is in high demand these days, designing projects in Hong Kong, Milan, and Seoul, not to mention the London Aquatics Center, the swimming arena for the 2012 Olympics. But one of the firm’s smaller clients, the city of Elk Grove, Calif., recently conjured far different kinds of aquatic life when members of the City Council and the public chose words like “squid,” “octopus,” and “starfish” to describe the latest renderings for a proposed civic center.

| Mar 11, 2011

Chicago office building will serve tenants and historic church

The Alter Group is partnering with White Oak Realty Partners to develop a 490,000-sf high-performance office building in Chicago’s West Loop. The tower will be located on land owned by Old St. Patrick’s Church (a neighborhood landmark that survived the Chicago Fire of 1871) that’s currently being used as a parking lot.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 



Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021