The JW Marriott brand holds high standards for its luxury hotels, and the new property in Hanoi, Vietnam, is no different. The 74,384-sm building conveys a distinct Vietnamese flair, with its stylized dragon form inspired by local mythology and the country’s coastline.
Sited next to the Vietnam National Convention Center and the Hanoi Museum, convenient to nearby tourist attractions, the JW Marriott Hanoi greets visitors with a landscaped, semi-circular courtyard. Below this raised entry plaza lies a podium level housing two ballrooms; meeting facilities; dining, bar, and lounge areas; three levels of indoor parking; and back-of-house support functions. Atop the podium, the hotel includes a grand lobby, 450 guest rooms and suites, an executive lounge, a glass-enclosed rooftop swimming pool, and a fitness center.
The hotel is built for ADA compliance, even though no such laws currently exist in Vietnam. Accommodations include wider entry corridors in several rooms and special considerations in bathroom facilities. Elegant finishes are a priority throughout.
“It’s not easy working with Marriott’s standards,” remarks Building Team Awards judge Susan Heinking, AIA, NCARB, LEED AP O+M, Vice President and Director of Sustainability at VOA Associates. Indeed, this Building Team had to navigate a thicket of design requirements, including directives from owner Bitexco Group, Marriott International, and the neighboring Vietnam National Convention Center.
GOLD AWARD
Project summaryJW Marriott Hanoi Hotel
Hanoi, VietnamBUILDING TEAM
Submitting firm: Turner International – Vietnam (CM)
Owner/developer: Bitexco Group
Hotel operator: Marriott International
Architect: Carlos Zapata Studio
Architect of record: Viet Nam National Construction Consultants Corporation
Interior architects: Peter Silling & Associates Hotel Interior Design; DWP | Design Worldwide Partnership
Structural: Leslie E. Robertson Associates
Foundation: GECI
MEP: DSA Engineering Contractors: Hyundai Engineering & Construction; Delta Civil and Industrial Construction; Trung A. Stock ConstructionGENERAL INFORMATION
Project size: 74,384 sm
Construction cost: Confidential at owner’s request
Construction period: November 2009 to September 2013
Delivery method: PM/CM as agent, fast-trackMarriott’s in-house architectural group—responsible for overseeing design of all the brand’s hotels and resorts—was brought in at several stages for input and approval, but adherence to their standards proved difficult when financial problems led to a two-year delay.
Marriott criteria had changed in the interim, and new design styles caused previously selected finishes to be rejected. In addition, the clients decided to reorganize the site to make room for two villas, scrapping plans to build tennis courts and install a significant amount of landscaping.
Even basic communication was a concern, with Building Team members and consultants such as Turner Construction, Carlos Zapata Studio, Leslie E. Robertson Associates, and DSA Engineering scattered among offices in nine different countries. The firms decided early on that English would be the standard for all communications.
Vietnam is still a developing country in many aspects, so there was concern about the availability of skilled workers. Safety was also paramount, with Turner implementing weekly training sessions and audits to reinforce this priority for crews. Figuring out the best way to deploy teams—and to keep employees reporting through delays and cash-flow difficulties—made construction management even more complex.
The Building Team brought in international consultants and engineers when expertise was needed on elements unfamiliar to Vietnamese partner firms, such as the cantilevered design and structural steel construction. Sika, which supplied the waterproofing system for the podium roof, sent employees to train contractors on-site to prevent leaks that could threaten the ballrooms below.
The way the JW Marriott Hanoi came together in spite of the obstacles and difficulty level impressed the Building Team Awards judges. Says juror Matthew Dumich, AIA, of Adrian Smith + Gordon Gill Architecture: “It’s as if someone said, ‘No one knows how to do any of this stuff. Let’s do it anyway.’ And it works.”
A curtain wall system at the podium level brings natural light into the hotel’s café. Elegant finishes were a priority for the owner. PHOTO: NGUYEN HAI VAN / COURTESY TURNER VIETNAM
The structure is constructed on a podium, with ballrooms and restaurants on the lowest floor enjoying riverfront views. PHOTO: VU LONG / COURTESY TURNER VIETNAM
Related Stories
Retail Centers | Jan 31, 2022
Amazon Style: Amazon’s latest innovative physical shopping experience
In January, Amazon unveiled plans to build a physical fashion store concept, dubbed Amazon Style, in Los Angeles. The e-commerce giant says the store will offer “together the best of shopping on Amazon–great prices, selection, and convenience–with an all new shopping experience built to inspire.”
Sponsored | BD+C University Course | Jan 30, 2022
Optimized steel deck design
This course provides an overview of structural steel deck design and the ways to improve building performance and to reduce total-project costs.
Laboratories | Jan 28, 2022
3 must-know strategies for developers in today’s life sciences industry
While the life sciences industry had been steadily growing, this growth exploded when the pandemic arrived—and there is no indication that this lightning-fast pace will slow down any time soon.
Cultural Facilities | Jan 27, 2022
Growth in content providers creates new demand for soundstage facilities
Relativity Architects' Partner Tima Bell discusses how the explosion in content providers has outpaced the availability of TV and film production soundstages in North America and Europe.
Sponsored | Webinar | Jan 27, 2022
On-demand webinar: Open plenum design with baffles
With their vast, airy aesthetics, open-plan interiors offer a feel that can inspire and support occupants. But they can also create acoustical challenges that negate the effects of all that beauty. Baffles are an ideal ceiling design solution that address both aesthetics and performance.
Architects | Jan 27, 2022
Gensler’s latest design forecast is also a call to action
The firm urges the AEC industry to take the lead in creating a fairer, cleaner built environment that faces many obstacles.
Architects | Jan 26, 2022
HMC Architects Welcomes New Director of Sustainability
The Sacramento studio of leading national architecture and design firm HMC Architects has announced the appointment of new Director of Sustainability Jennifer Wehling, who joined in December
Market Data | Jan 26, 2022
2022 construction forecast: Healthcare, retail, industrial sectors to lead ‘healthy rebound’ for nonresidential construction
A panel of construction industry economists forecasts 5.4 percent growth for the nonresidential building sector in 2022, and a 6.1 percent bump in 2023.
Sponsored | Steel Buildings | Jan 25, 2022
Structural Game Changer: Winning solution for curved-wall gymnasium design
Sponsored | Steel Buildings | Jan 25, 2022
Multifamily + Hospitality: Benefits of building in long-span composite floor systems
Long-span composite floor systems provide unique advantages in the construction of multi-family and hospitality facilities. This introductory course explains what composite deck is, how it works, what typical composite deck profiles look like and provides guidelines for using composite floor systems. This is a nano unit course.