flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

DPR Foundation awards $590,000 to youth organizations

DPR Foundation awards $590,000 to youth organizations

Grants will fund programs for disadvantaged kids across six states.


By By BD+C Staff | December 7, 2011
DPR Construction DPR Foundation
The DPR Foundation, the charitable arm of DPR Construction, one of the nations top technical builders focused on highly complex
This article first appeared in the January 2012 issue of BD+C.

The DPR Foundation, the charitable arm of DPR Construction, one of the nation’s top technical builders focused on highly complex and sustainable projects, announced its continued commitment to supporting youth organizations in need by awarding $590,000 in grants to 12 organizations in cities across the U.S.

The 2011-2012 grant money will be distributed across nine returning grantees and three new organizations featuring youth programs targeting disadvantaged kids from grade school to high school.

New DPR Foundation grantee organizations for 2011-2012 include:

  • ICAN – Improving Chandler Area Neighborhoods (Chandler, Ariz.)
  • The Milagro Center (Delray Beach, Fla.) and
  • John Avery Boys & Girls Club of Durham (Durham, N.C.).

All nine remaining organizations are returning grantees including:

  • The Boys & Girls Club of Metro Atlanta (Atlanta, Ga.)
  • Maryland Multi-cultural Youth Center (Riverdale, Md.)
  • New Hope for Kids (Orlando, Fla.)
  • Future for Kids (Phoenix, Ariz.)
  • Peninsula Bridge (Palo Alto, Calif.)
  • Roberts Family Development Center (Sacramento, Calif.)
  • StandUp for Kids (San Diego)
  • Turning Wheels for Kids (San Jose, Calif.) and
  • Seven Tepees Youth Center (San Francisco).

The DPR Foundation, established by DPR Construction in 2008, has awarded nearly $1.5 million to 17 different organizations over the past four years and is committed to helping disadvantaged children within each of the company’s local communities by building lasting relationships with youth-focused organizations. The DPR Foundation is a company-wide outreach to help children who fall short of their potential due to socio-economic challenges.

In addition to financial assistance in the form of grants, the DPR Foundation selects organizations that also have a great need for volunteer help. The Foundation seeks organizations with after-school programs, tutoring, field trips and summer camps so DPR employees can get involved in the community effort. The Foundation also measures success of these program and volunteer efforts to ensure the program remains on mission and continues to achieve results. BD+C

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021