Have you wondered why some design ideas soar and others crash? Why clients embrace or reject a design concept? Whether your firm’s designs are trendsetters or followers?
To get answers to those and other design-related questions, Building Design+Construction polled the industry earlier this year, and received responses from 342 companies, most of which were architects, engineers, and contractors. The result of that survey is BD+C’s 2021 Design Innovations Report, whose 22 pages explore the complexities behind creating, pitching, and executing new ideas.
The purpose of this report is to:
- Uncover where AEC firms focus their efforts and how they stimulate new ideas;
- Gauge how receptive owners and developers are to project ideas, and why;
- Reveal which design trends—such as modularity, or the use of mass timber—are (or aren’t) catching on
- Examine whether firms’ idea machines are keeping pace with the rate of change in business, lifestyle, and society.
Some takeaways from the report include:
- The biggest factors that result in an innovation’s success or failure are cost, client buy-in, and communication;
- Several typologies—offices, education, multifamily, healthcare—are glaring in their need for innovation, even as these same building types have been cited as design leaders in the past;
- Contractors are often their clients’ gatekeepers when it comes to deciding which design innovations fly;
- Mentoring and training are the primary catalysts within AEC firms for nurturing new ideas;
- The coronavirus pandemic accelerated the need for design innovations, especially for indoor air quality and wellness.
The report makes clear that there’s no shortage of ideas or new products, and that “innovation” and “technology” are often thought of together.
Download BD+C’s 2021 Design Innovation Report (short registration required)
Related Stories
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.