flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Doug Woods, DPR Construction's cofounder, dead at 70

Contractors

Doug Woods, DPR Construction's cofounder, dead at 70

His management style stressed collaboration that can tackle complex projects.


By John Caulfield, Senior Editor | May 25, 2021
Doug Woods (center), in a 2015 photo with DPR Construction cofounders Ron Davidowski (left) and Peter Nosler. Their business is one of the industry's leading general contractors. Images: DPR

Doug Woods (center), in a 2015 photo with DPR Construction cofounders Ron Davidowski (left) and Peter Nosler. Their business is one of the industry's leading general contractors. Images: DPR

   

Doug Woods, cofounder of Redwood City, Calif.-based DPR Construction, passed away peacefully at his home on May 19, according to a statement released by the company. He was 70 years old.

The cause of death and the names of family survivors were not immediately available.

With partners Peter Nosler and Ron Davidowski, and $750,000 in pooled resources, Woods launched DPR as a self-performing general contractor in Palo Alto, Calif., in 1990. (The firm’s name derives from the initials of the founders’ first names.) “When we started DPR, we wanted to be a customer-focused organization,” recalls Woods, who always saw DPR as a service business. “We’re not a hard-bid general contractor; we’re a negotiating, self-performing general contractor that takes care of our customers. To do that, we need great people, who are happy and willing to work hard. That’s one of the things that started us, making us different from the very beginning.”

By 1995, DPR ranked third on Inc. Magazine’s national fastest-growing private companies listing. And over more than 30 years, Woods, Nosler and Davidowski watched their business expand into one of the industry’s largest GCs, with roughly 6,500 office and craft employees worldwide and more than $6 billion in revenue in 2019, the latest year for which sales information was available.

Woods stepped back from day-to-day management of the firm in 2015, but stayed on DPR’s Management Committee until 2017. He served as CEO on the firm’s board of directors until his passing.

CONSTRUCTION IN HIS BLOOD

Doug Woods, cofounder, DPR Construction

DPR Construction's Doug Woods emphasized team building and customer service.

 

Born in Ontario on January 27, 1951, Woods was the son of an engineer. His family built or remodeled every house that Woods lived in growing up, and his father worked in construction and real estate. “Being in the construction field is in my blood,” Woods was quoted as saying.

DPR’s first ground-up project was a skilled-nursing facility for The Terraces in Los Gatos, Calif., and healthcare has since been one of its primary practices. The firm hit $1 billion in annual revenue for the first time in 1998. But Woods wasn’t interested so much in milestones. “For us, there has been no single defining moment but a series of opportunities and challenges that have impacted the company DPR is today and made us stronger.

The company’s unregimented management style—“No titles, no ties, no org chart,” Woods told the San Francisco Business Times in 2015—found its success in collaborative teamwork, which is palpable in the reminiscences of several colleagues and employees.

TEAM BUILDING MORE WORDS

“I only had the privilege of meeting Doug maybe six times. From a guy who came up from the field and had limited education, Doug really showed me what ‘no rank in the room’ meant: ‘Don’t ever forget, we exist to build great things,’ ” recalled Robbie Thomason, a senior superintendent who has been with DPR for more than seven years.

David Ibarra, a 25-year company vet who directs the firm’s mission-critical group, remembers meeting Woods as a new employee doing electrical on a complex project. Woods wanted to know if Ibarria was getting the management support he needed in the field to execute his job. “If not, he told me ‘just call them out.’ I had a founder talking to me directly, and ensuring that I was empowered to do my role.”

Kurt Wallner, a Project Executive at DPR, first encountered Woods in May 2000, when the latter was laying out the firm’s 2030 Mission. “Hearing Doug talk about a vision for DPR, decades into the future, I knew right then that I was joining something very, very special.”

Woods served on the Construction Industry Roundtable and was a board member with U.S. Green Building Council. And his legacy at DPR could, in part, be defined by Mission 2030, the firm’s strategic focus to be recognized as one of the world’s most admired companies by that year.

Related Stories

Coronavirus | May 20, 2022

Center for Green Schools says U.S. schools need more support to fight COVID-19

  The Center for Green Schools at the U.S. Green Building Council released a new report detailing how school districts around the country have managed air quality within their buildings during the second year of the COVID-19 pandemic.

Regulations | May 20, 2022

Biden’s Clean Air in Buildings Challenge aims to reduce COVID-⁠19 spread

The Biden Administration recently launched the Clean Air in Buildings Challenge that calls on all building owners and operators, schools, colleges and universities, and organizations to adopt strategies to improve indoor air quality in their buildings and reduce the spread of COVID-19.

Building Team | May 20, 2022

Caltech breaks ground on a new center to study climate and sustainability

The California Institute of Technology (Caltech) recently broke ground on its Resnick Sustainability Resource Center.

Laboratories | May 20, 2022

Brutalist former Berkeley Art Museum transformed into modern life science lab

After extensive renovation and an addition, the former Berkeley Art Museum and Pacific Film Archive at the University of California, Berkeley campus reopened in May 2022 as a modern life science lab building.

Sports and Recreational Facilities | May 19, 2022

Northern Arizona University opens a new training center for its student athletes

In Flagstaff, Ariz. Northern Arizona University (NAU) has opened its new Student-Athlete High Performance Center. 

Energy-Efficient Design | May 19, 2022

Shipping containers used to build Research Triangle Park’s first community gathering space

Shipping containers were the prominent building material used to construct Boxyard RTP, the first public community and gathering place in North Carolina’s Research Triangle Park (RTP). 

Mixed-Use | May 19, 2022

Seattle-area project will turn mall into residential neighborhood

A recently unveiled plan will transform a 463,000 sf mall into a mixed-use destination site in the Seattle suburb of Bellevue, Wash.

Codes and Standards | May 19, 2022

JLL launches non-profit aiming to mitigate climate change

Real estate and investment management firm JLL recently launched JLL Foundation, a non-profit dedicated to making a long-term impact on environmental sustainability.

Office Buildings | May 19, 2022

JLL releases its 2022 Office Fit Out Guide

JLL’s 2022 Office Fit Out Guide report provides benchmark costs to build out a range of office types across major markets in the United States and Canada.

Biophilic Design | May 18, 2022

Horticulturalists conduct research study to understand the value of biophilic design

Benholm Group, horticulturalists that have pioneered the use of plants for interiors over the past 27 years, are collaborating on a research study to understand the value of biophilic design, according to a news release.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021