flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

DOE selects design-build team for laboratory focused on clean energy innovation

Laboratories

DOE selects design-build team for laboratory focused on clean energy innovation

JE Dunn Construction and SmithGroup will construct the 127,000-sf Energy Materials and Processing at Scale (EMAPS) clean energy laboratory in Colorado to create a direct path from lab-scale innovations to pilot-scale production.


By Novid Parsi, Contributing Editor | February 5, 2024
DOE selects design-build team for laboratory focused on clean energy innovation
EMAPS will enable materials and process innovations in energy storage, advanced manufacturing, grid modernization, and net-zero chemicals and fuels for transportation and industrial decarbonization. Rendering courtesy SmithGroup/JE Dunn

The U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) has selected JE Dunn Construction and SmithGroup as the design-build team for a new laboratory facility that will accelerate market-ready products needed for a clean energy transition.

As the new face of NREL’s South Table Mountain Campus in Golden, Colo., the 127,000-sf Energy Materials and Processing at Scale (EMAPS) laboratory will create a direct path from lab-scale materials and process innovations to pilot-scale integration and production. The project is slated to break ground in late 2024. 

The laboratory’s design will provide opportunities for engineers, scientists, industry partners, and other DOE laboratories to work together in shared lab facilities focused on clean energy innovations. This collaborative, multidisciplinary approach will accelerate the process scale-up and market adoption of advanced energy materials. 

Energy storage, advanced manufacturing among clean energy initiatives

Specifically, EMAPS will enable materials and process innovations in energy storage, advanced manufacturing, grid modernization, and net-zero chemicals and fuels for transportation and industrial decarbonization. 

In addition, the laboratory will address end-of-life and circularity challenges across multiple energy technology platforms with a focus on polymers, packaging, and waste streams during and after production.

With building design now underway, EMAP will provide modern, open, and flexible spaces that can accommodate rapid experimentation among researchers. Featuring a three-story collaborative lab and office tower, the center will facilitate flexibility and reconfigurability to serve different research insights and needs. Researchers will be able to move easily from workstation computers to testing in labs to manufacturing testing in pilot bays.

The design will align with NREL’s focus on sustainability, solar orientation and daylighting, energy efficiency, and site preservation. With its sustainable, high-performance design, EMAPS will aim for a minimum of LEED Gold certification.

A decade ago, JE Dunn and SmithGroup partnered with NREL to complete the Energy Systems Integration Facility (ESIF), a 180,000-sf research building adjacent to the future site of EMAPS.

On the Building Team:
Owner: U.S. Department of Energy’s National Renewable Energy Laboratory (NREL)
Design architect, architect of record, and MEP engineer: SmithGroup
Structural engineer: Martin/Martin
General contractor: JE Dunn Construction

Related Stories

| Aug 8, 2022

Mass timber and net zero design for higher education and lab buildings

When sourced from sustainably managed forests, the use of wood as a replacement for concrete and steel on larger scale construction projects has myriad economic and environmental benefits that have been thoroughly outlined in everything from academic journals to the pages of Newsweek.

Laboratories | Jul 17, 2022

Renovation is filling the need for life sciences lab space

Three experts from the firm DiMella Shaffer discuss the advantages and challenges of converting existing buildings.

Laboratories | Jun 29, 2022

The "collaboratory" brings digital innovation to the classroom

The Collaboratory—a mix of collaboration and laboratory—is a networking center being designed at the University of Denver’s College of Business.

Museums | Jun 28, 2022

The California Science Center breaks grounds on its Air and Space Center

The California Science Center—a hands-on science center in Los Angeles—recently broke ground on its Samuel Oschin Air and Space Center.

University Buildings | Jun 7, 2022

Newfoundland university STEM building emulates natural elements, local traditions

Memorial University of Newfoundland (MUN) recently opened a new building that will provide interdisciplinary learning and research space for Faculties of Science and Engineering.

Laboratories | May 20, 2022

Brutalist former Berkeley Art Museum transformed into modern life science lab

After extensive renovation and an addition, the former Berkeley Art Museum and Pacific Film Archive at the University of California, Berkeley campus reopened in May 2022 as a modern life science lab building.

Laboratories | Apr 29, 2022

Oracle Industry Lab in Chicago enables development of solutions for multiple industries

The Oracle Industry Lab in Chicago, which provides customers in multiple industries the opportunity to test new technologies, recently opened.

Laboratories | Apr 7, 2022

North Carolina's latest play for biotech real estate development

The Tar Heel State is among a growing number of markets rolling out the welcome mat for lab spaces.

Projects | Mar 11, 2022

Studying science in the sky

In sharp contrast to other types of commercial real estate, the life sciences market is booming, according to SGA, an architecture firm based in Boston and New York that has extensive experience designing life sciences buildings.

Laboratories | Feb 10, 2022

Historic building becomes a research science incubator

Svigals + Partners designed the project.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021