flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Document provides guidance for mass timber construction

Codes and Standards

Document provides guidance for mass timber construction

Overview of Intl. Building Code requirements included.


By Peter Fabris, Contributing Editor | August 12, 2020

Courtesy Pixabay

The American Wood Council (AWC) and International Code Council have released a joint publication, Mass Timber Buildings and the IBC.

The document provides an overview of requirements for mass timber construction as found in the 2015, 2018, and 2021 International Building Code (IBC). It highlights historic changes beginning with the 2015 International Building Code, that allow for construction of mass timber buildings with taller heights and areas than was permitted for buildings of wood construction types (Types III, IV, and V) prior to the 2015 IBC.

The publication reviews the 2015 IBC recognition of cross-laminated timber (CLT) and the reorganization of heavy timber provisions in the 2018 IBC. It also reviews the significant changes in the 2021 IBC and International Fire Code (IFC) for tall mass timber construction.

“Given the anticipated demand across the country for taller mass timber buildings, this publication provides the building safety community with comprehensive explanations of the new regulations,” said AWC vice president of codes & regulations, Kenneth Bland.

Related Stories

| Feb 23, 2012

New Virginia statewide building code goes into effect March 1

After March 1, all building plans in Virginia must adhere to the 2009 code that was adopted a year ago.

| Feb 23, 2012

Privatizing flood insurance could lead to new code requirements

One thing that could pave the way toward private flood insurance would be NFIP reforms, like requiring new construction in flood-prone areas to be elevated.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 20, 2012

Comment period for update to USGBC's LEED Green Building Program now open

This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

| Feb 17, 2012

Comment period opens March 1 for LEED 2012 update

USGBC says that LEED's strength comes from its continuous evolution.

| Feb 17, 2012

OSHA training videos on proper respirator use available online

17 short videos to help workers learn about the proper use of respirators on the job.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021