“It is the first time that a number of 100-plus-year-old construction firms are waking up in a cold sweat and saying, ‘We might get Uber’d.’ Instead of innovating to improve productivity, there is a sense of urgency and need to innovate to survive, let alone thrive.” — Darren Bechtel, Founder, Managing Director, Brick & Mortar Ventures (as told to BuiltWorlds)
“One of the biggest risks today is not leveraging technology, or refusing to be an early adopter of the ‘next big thing.’ There will be major technological disrupters in this market, and the company that’s slow to pick up on them is essentially diminishing its position in a very competitive industry.” — Patrick O’Connor, Vice President of Risk Management and Counsel, The Walsh Group (as told to FMI Corp.)
Declarations like these are not hyperbole, nor are they specific to the AEC industry. Leaders in almost all business sectors—if they are half-way competent—operate their organizations with a sense of angst and a healthy dose of paranoia, preparing for what’s around the corner.
Well, there is plenty around the corner these days, and AEC firms are scrambling to adjust to the coming “new normal” of commercial design and construction.
Are we ready for technological disruption? What tools and processes can we employ to gain efficiencies and eliminate waste? Who are our future leaders? What skills are required for the next generation of practitioners? What are the short- and long-term needs of our clients, and their building assets? Is Google going to take our jobs? (No joke. I’ve heard this one more than once.)
These are among the litany of considerations that AEC firms must address to future-proof their organizations.
But while talk of the disruptive nature of technology and innovation captures the headlines, what’s really keeping the leaders of the nation’s largest general contractor and construction management firms up at night is people.
In a new survey by FMI Corp. of C-suite and risk management professionals at GC and CM firms, 80% of respondents identified a “limited supply of skilled craftworkers” as a top risk for 2019, and 44% cited a “limited supply of experienced field supervisors” as a primary concern. Exacerbating the talent shortage is the coming mass exodus of baby boomers as they reach retirement age.
In response, firms are placing priority on bringing craftworkers and design professionals in-house; strengthening training and development programs; and bolstering talent recruitment efforts by giving HR managers a seat at the executive table. Is it enough? That remains to be seen, but it’s a good start.
Download the free report at: tinyurl.com/FMIrisk19.
Related Stories
| Apr 27, 2012
Hampton Bays Middle School winner of the first National Green Ribbon Schools Program
School was the first LEED-certified public school in the state of New York.
| Apr 26, 2012
USGBC announces inaugural Green Apple Day of Service
On Sept. 29, 2012, participants from all over the world will volunteer to make the schools and campuses in their communities healthier and more sustainable.
| Apr 26, 2012
Gensler's Leiserowitz: Employs holistic philosophy to foster clients' creativity, comfort
Leiserowitz became regional managing principal in Chicago for San Francisco-based architecture and design giant Gensler a little more than a year ago.
| Apr 26, 2012
Blackney Hayes Architects launches new engineering division
The new division, BHH Engineers, will be led by Mark Hershman, PE.
| Apr 26, 2012
Energy efficiency requirements heighten the importance of proper protection for roofing systems
Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.
| Apr 26, 2012
Orange County, Fla. high school receives NAIOP “Public Development of the Year” award
School replacement designed by SchenkelShultz Architecture and constructed by Williams Co.
| Apr 25, 2012
Bubble skyscraper design aims to purify drinking water
The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration
| Apr 25, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center
Project receives LEED Gold Certification.
| Apr 25, 2012
McCarthy introduces high school students to a career in construction
High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.
| Apr 25, 2012
Missner Group names McCrory VP of property management
McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.