“It is the first time that a number of 100-plus-year-old construction firms are waking up in a cold sweat and saying, ‘We might get Uber’d.’ Instead of innovating to improve productivity, there is a sense of urgency and need to innovate to survive, let alone thrive.” — Darren Bechtel, Founder, Managing Director, Brick & Mortar Ventures (as told to BuiltWorlds)
“One of the biggest risks today is not leveraging technology, or refusing to be an early adopter of the ‘next big thing.’ There will be major technological disrupters in this market, and the company that’s slow to pick up on them is essentially diminishing its position in a very competitive industry.” — Patrick O’Connor, Vice President of Risk Management and Counsel, The Walsh Group (as told to FMI Corp.)
Declarations like these are not hyperbole, nor are they specific to the AEC industry. Leaders in almost all business sectors—if they are half-way competent—operate their organizations with a sense of angst and a healthy dose of paranoia, preparing for what’s around the corner.
Well, there is plenty around the corner these days, and AEC firms are scrambling to adjust to the coming “new normal” of commercial design and construction.
Are we ready for technological disruption? What tools and processes can we employ to gain efficiencies and eliminate waste? Who are our future leaders? What skills are required for the next generation of practitioners? What are the short- and long-term needs of our clients, and their building assets? Is Google going to take our jobs? (No joke. I’ve heard this one more than once.)
These are among the litany of considerations that AEC firms must address to future-proof their organizations.
But while talk of the disruptive nature of technology and innovation captures the headlines, what’s really keeping the leaders of the nation’s largest general contractor and construction management firms up at night is people.
In a new survey by FMI Corp. of C-suite and risk management professionals at GC and CM firms, 80% of respondents identified a “limited supply of skilled craftworkers” as a top risk for 2019, and 44% cited a “limited supply of experienced field supervisors” as a primary concern. Exacerbating the talent shortage is the coming mass exodus of baby boomers as they reach retirement age.
In response, firms are placing priority on bringing craftworkers and design professionals in-house; strengthening training and development programs; and bolstering talent recruitment efforts by giving HR managers a seat at the executive table. Is it enough? That remains to be seen, but it’s a good start.
Download the free report at: tinyurl.com/FMIrisk19.
Related Stories
| Jun 1, 2012
Ground broken for Children’s Hospital Colorado South Campus
Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.
| Jun 1, 2012
K-State Olathe Innovation Campus receives LEED Silver
Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.
| Jun 1, 2012
New York City Department of Buildings approves 3D BIM site safety plans
3D BIM site safety plans enable building inspectors to take virtual tours of construction projects and review them in real-time on site.
| May 31, 2012
Product Solutions June 2012
Curing agents; commercial faucets; wall-cladding systems.
| May 31, 2012
8 steps to a successful BIM marketing program
It's not enough to have BIM capability--you have to know how to sell your BIM expertise to clients and prospects.
| May 31, 2012
3 Metal Roofing Case Studies Illustrate Benefits
Metal roofing systems offer values such as longevity, favorable life cycle costs, and heightened aesthetic appeal.
| May 31, 2012
AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| May 31, 2012
2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College
Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.