“It is the first time that a number of 100-plus-year-old construction firms are waking up in a cold sweat and saying, ‘We might get Uber’d.’ Instead of innovating to improve productivity, there is a sense of urgency and need to innovate to survive, let alone thrive.” — Darren Bechtel, Founder, Managing Director, Brick & Mortar Ventures (as told to BuiltWorlds)
“One of the biggest risks today is not leveraging technology, or refusing to be an early adopter of the ‘next big thing.’ There will be major technological disrupters in this market, and the company that’s slow to pick up on them is essentially diminishing its position in a very competitive industry.” — Patrick O’Connor, Vice President of Risk Management and Counsel, The Walsh Group (as told to FMI Corp.)
Declarations like these are not hyperbole, nor are they specific to the AEC industry. Leaders in almost all business sectors—if they are half-way competent—operate their organizations with a sense of angst and a healthy dose of paranoia, preparing for what’s around the corner.
Well, there is plenty around the corner these days, and AEC firms are scrambling to adjust to the coming “new normal” of commercial design and construction.
Are we ready for technological disruption? What tools and processes can we employ to gain efficiencies and eliminate waste? Who are our future leaders? What skills are required for the next generation of practitioners? What are the short- and long-term needs of our clients, and their building assets? Is Google going to take our jobs? (No joke. I’ve heard this one more than once.)
These are among the litany of considerations that AEC firms must address to future-proof their organizations.
But while talk of the disruptive nature of technology and innovation captures the headlines, what’s really keeping the leaders of the nation’s largest general contractor and construction management firms up at night is people.
In a new survey by FMI Corp. of C-suite and risk management professionals at GC and CM firms, 80% of respondents identified a “limited supply of skilled craftworkers” as a top risk for 2019, and 44% cited a “limited supply of experienced field supervisors” as a primary concern. Exacerbating the talent shortage is the coming mass exodus of baby boomers as they reach retirement age.
In response, firms are placing priority on bringing craftworkers and design professionals in-house; strengthening training and development programs; and bolstering talent recruitment efforts by giving HR managers a seat at the executive table. Is it enough? That remains to be seen, but it’s a good start.
Download the free report at: tinyurl.com/FMIrisk19.
Related Stories
| May 13, 2014
Libeskind wins competition to design Canadian National Holocaust Monument
A design team featuring Daniel Libeskind and Gail Dexter-Lord has won a competition with its design for the Canadian National Holocaust Monument in Toronto. The monument is set to open in the autumn of 2015.
| May 11, 2014
8 starter questions to answer when thinking about building
So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT
| May 8, 2014
Don’t bother planning for the future - it doesn’t care about you
Though strategic planning has helped many businesses move forward, its time has passed. So says Economist and Author Bill Conerly. SPONSORED CONTENT
| May 8, 2014
Infographic: 4 most common causes of construction site fatalities
In honor of Safety Week, Skanska put together this nifty infographic on how to prevent deadly harm in construction.
| May 6, 2014
'Beyond' is artist's cinematic take on 2.5 years of development in the UAE
Seven-minute video offers a time-lapse trip through the built environments of Abu Dhabi and Dubai.
| May 6, 2014
'Ugliest building in New Jersey' finally getting facelift
After a decade of false starts and mishaps, the American Dream mall in the Meadowlands may finally get built.
| May 5, 2014
Toronto residential tower to feature drawer-like facade scheme
Some of the apartments in the new River City development will protrude from the building at different lengths, creating a drawer-like "push-pull" effect.
| May 2, 2014
Structure Tone pleads guilty to charge of arranging inflated subcontractor bills
Construction giant will pay a $55 million forfeiture after pleading guilty to a charge of arranging inflated subcontractor fees.
| May 2, 2014
Norwegian modular project set to be world's tallest timber-frame apartment building [slideshow]
A 14-story luxury apartment block in central Bergen, Norway, will be the world's tallest timber-framed multifamily project, at 49 meters (160 feet).