flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

DLR Group’s design for the new Lansing Correctional Facility focuses on energy-efficiency

Government Buildings

DLR Group’s design for the new Lansing Correctional Facility focuses on energy-efficiency

JE Dunn will manage the design and construction of the Kansas-based facility.


By David Malone, Associate Editor | April 26, 2018
The new Lansing Correctional Facility

Courtesy CoreCivic

DLR Group, JE Dunn Construction, and CoreCivic are teaming up to design and build the Kansas Department of Corrections’ new facility at the Lansing Correctional Campus in Lansing, Kan.

The new 396,719-sf facility will focus on energy efficiency and sustainability. It will include an energy saving shell design with a top-of-the-line roofing system and highly insulated walls systems. Modern utility systems will also help with energy and cost savings. The design also includes advanced security systems (always good in a correctional facility), a local maintenance staff, and locksmiths.

 

See Also: Is this the world's most humane prison?

 

New housing units, additional inmate beds, new intake units, and associated support spaces are all part of the new design. There will also be new dedicated spaces for medical services, food services, spiritual life, staff support areas, and indoor and outdoor recreation areas. Ample site circulation and parking space will be provided, all with improved lighting.

The design-build process is expected to take 24 months to complete.

Related Stories

| Jan 28, 2014

2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs

Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry. 

| Jan 28, 2014

16 awe-inspiring interior designs from around the world [slideshow]

The International Interior Design Association released the winners of its 4th Annual Global Excellence Awards. Here's a recap of the winning projects.

| Jan 13, 2014

Custom exterior fabricator A. Zahner unveils free façade design software for architects

The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.

| Jan 11, 2014

Getting to net-zero energy with brick masonry construction [AIA course]

When targeting net-zero energy performance, AEC professionals are advised to tackle energy demand first. This AIA course covers brick masonry's role in reducing energy consumption in buildings. 

| Dec 31, 2013

BD+C's top 10 stories of 2013

The world's tallest twisting tower and the rise of augmented reality technology in construction were among the 10 most popular articles posted on Building Design+Construction's website, BDCnetwork.com.

| Dec 27, 2013

U.S. Capitol dome’s cracks to be repaired during $60 million renovation

Rings of scaffolding will start to rise this spring around the cast-iron dome of the U.S. Capitol in Washington as part of a $60 million renovation project to repair more than 1,300 cracks.

| Dec 20, 2013

Can energy hogs still be considered efficient buildings? Yes, say engineers at Buro Happold

A new tool from the engineering firm Buro Happold takes into account both energy and economic performance of buildings for a true measure of efficiency. 

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Dec 9, 2013

Skaneateles, N.Y., converts old firehouse to net-zero village hall

The Finger Lakes village of Skaneateles, N.Y., renovated its vacant firehouse into Skaneateles Village Hall, the first municipal net-zero energy building in the state of New York.

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021