flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

DLR Group to design new facility for Jacksonville’s Museum of Science & History

Museums

DLR Group to design new facility for Jacksonville’s Museum of Science & History

The museum has outgrown its location on the Southbank of Downtown Jacksonville.


By David Malone, Managing Editor | August 27, 2021
MOSH concept exhibition space shuttle

Renderings courtesy DLR Group

The Museum of Science & History (MOSH) has selected DLR Group as the lead architect for the MOSH Genesis project on the Northbank of Downtown Jacksonville.

The new project will replace the current location on the Southbank of Downtown Jacksonville, where MOSH has been since 1969. Early projections show the new facility will be able to serve 58,000 students (a 50% increase over pre-pandemic numbers) and 469,000 visitors (a 168% increase) each year.

 

MOSH concept interior exhibition space

 

“MOSH will have a dramatic impact on the Jacksonville region, telling its unique story of human and natural history and culture, innovation and current science,” said DLR Group Senior Principal Paul Westlake, FAIA, who leads the firm’s Cultural+Performing Arts practice, in a release.

 

MOSH concept interior sea life exhibition

 

The new museum will comprise dedicated areas for exhibitions, classes, and events that will create an immersive experience reflective of Jacksonville’s history. The building will also incorporate a new space for the Bryan-Gooding Planetarium. The goal of the project is to reinforce MOSH’s role as a vital civic institution and a destination for accessible, immersive, and technologically advanced experiences.

DLR Group will work with kasper architects + associates and SCAPE on the project. The $85 million project is expected to take three years to build. Pre-construciton site work may begin as early as Q1 2022.

Tags

Related Stories

Museums | Dec 7, 2021

The Palo Alto Junior Museum and Zoo completes

CAW Architects designed the project.

Giants 400 | Nov 19, 2021

2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Museums | Nov 10, 2021

Tampa Museum of Art announces $65 million expansion

Weiss/Manfredi is designing the expansion and the renovation of the existing museum building.

Museums | Oct 29, 2021

Rowan University’s new fossil museum sits within an active dinosaur fossil dig

   Ennead Architects (Design Architect) together with KSS Architects (Architect of Record) are designing the project.

Museums | Oct 15, 2021

Kunsthaus Zürich extension opens to the public

David Chipperfield Architects Berlin designed the project.

Museums | Sep 27, 2021

The Academy Museum of Motion Pictures set to open on Sept. 30 in Los Angeles

Renzo Piano Building Workshop designed the project.

Museums | Aug 31, 2021

The Making of Harry Potter tour set to open on former Toshimaen amusement park grounds

Warner Bros. Studio Tour Tokyo will operate the facility.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Museums | Aug 24, 2021

MAD Architects unveils design for Hainan Science and Technology Museum

The project is slated to break ground in late August.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021