flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Disaster mitigation strategies that exceed code could save billions

Codes and Standards

Disaster mitigation strategies that exceed code could save billions

Four dollars saved for every dollar spent, says NIBS report.


By Peter Fabris, Contributing Editor | January 23, 2018

Specific disaster mitigation strategies that go beyond the requirements of the 2015 International Codes model building codes could save the nation billions of dollars, according to the National Institute of Building Sciences just issued Natural Hazard Mitigation Saves: 2017 Interim Report.

Investing in hazard mitigation measures to exceed select code requirements can save the nation $4 for every $1 spent, the report says. The report comes on the heels of the nation’s worst year of natural disasters in terms of cost. There were 16 events in 2017 with losses exceeding $1 billion, with total costs of about $306 billion, surpassing the record losses in 2005 by $100 billion.

Effective strategies to exceed minimum requirements of the 2015 I-Codes include:

– For flood resistance (to address riverine flooding and hurricane surge), building new homes higher than required by the 2015 International Building Code (IBC).

– For resistance to hurricane winds, building new homes to comply with the Insurance Institute for Business & Home Safety (IBHS) FORTIFIED Home Hurricane standards.

– For resistance to earthquakes, building new buildings stronger and stiffer than required by the 2015 IBC.

– For fire resistance in the wildland-urban interface, building new buildings to comply with the 2015 International Wildland-Urban Interface Code (IWUIC).

NIBS notes that while mitigation represents an excellent investment, not everyone is willing or able to bear construction costs for more resilient buildings, even if the long-term benefits exceed the up-front costs. Programs to help finance mitigation projects should align incentives from finance, insurance, government and other stakeholders, NIBS says.

Related Stories

Codes and Standards | Feb 14, 2019

ISO publishes first global BIM standards

Based on British standard and a publicly available standard.

Codes and Standards | Feb 11, 2019

Investing in downtowns pays off for cities, regions

Benefits include driving tax revenue, business activity, and smart development.

Codes and Standards | Feb 8, 2019

Oslo, Norway’s downtown goes virtually car-free

Parking spots converted to bike lanes, transit is fast and easy.

Codes and Standards | Feb 7, 2019

New North Carolina energy code has extensive lighting control requirements

Includes automatic shut offs for buildings of all sizes.

Codes and Standards | Feb 6, 2019

Solar carports can help with California’s Title 24 mandates

Can be combined with virtual net-metering software and tax-enabled financing.

Codes and Standards | Feb 1, 2019

Mass. governor proposes real estate transfer fee hike for climate resiliency projects

Opposed by real estate and trade groups, plan could generate $1 billion in next decade.

Codes and Standards | Jan 31, 2019

New York City will reform construction bid process

Streamlined process intended to improve efficiency, reduce hassle for bidders.

Codes and Standards | Jan 30, 2019

New AGC program aims to diversify construction workforce

More diversity needed to keep pace with demand for workers.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021