flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Diller Scofidio + Renfro merges old and new for UC Berkeley Art Museum design

Museums

Diller Scofidio + Renfro merges old and new for UC Berkeley Art Museum design

The $112 million project will provide more space for programming, both indoors and outdoors.


By BD+C Staff | July 1, 2015
Diller Scofidio + Renfro, Museum, Art, UC Berkeley

The building will provide 25,000 sf of exhibition space, as well as spaces for film screenings and public access to BAM/PFA collections. Renderings courtesy Diller Scofidio + Renfro

New York-based firm Diller Scofidio + Renfro has released its designs for a new UC Berkeley Art Museum and Pacific Film Archive, planned to open January 2016 in downtown Berkeley, Calif.

The building, located directly across from the UC Berkeley campus, integrates the existing 48,000-sf Art Deco-style building with a new 35,000-sf structure. In a press release, Charles Renfro, a Partner at Diller Scofidio + Renfro, says the new museum’s design merges the old and new to create a permeable interface between the institution and the public.

The building will provide 25,000 sf of exhibition space, as well as spaces for film screenings and public access to BAM/PFA collections.

In addition, a large outdoor LED will be integrated into the new structure for public film screenings.

With a philanthropic capital campaign and private sources, the project collected $112 million since 1997, after a seismic survey determined that Woo Hon Fai Hall, BAM/PFA’s current building, does not comply with today’s earthquake safety standards.

 

Tags

Related Stories

Museums | Nov 12, 2020

The National Museum of the United States Army opens

SOM designed the building.

Museums | Nov 5, 2020

The Weekly show: Designing cannabis facilities, Bob Borson's Life of an Architect, museum design

BD+C editors speak with experts from Cooper Robertson, Life of an Architect, and MJ12 Design Studio on the November 5 episode of "The Weekly." The episode is available for viewing on demand.

Museums | Oct 15, 2020

A new museum at Princeton University designed as ‘a campus within a campus’

The building would double the size of the existing museum.

Cultural Facilities | Oct 13, 2020

Thailand’s Elephant Museum reinforces the bond between humans and beasts

The complex, in Surin Province, was built with 480,000 clay bricks.

Museums | Oct 7, 2020

First rendering of the National Medal of Honor Museum unveiled

Rafael Viñoly Architects designed the project.

AEC Tech Innovation | Sep 18, 2020

New Innovation Center should heighten Port San Antonio’s tech profile

The facility will include a 2,500-seat arena and serve as new home for the city’s S&T museum.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Museums | Jun 12, 2020

How will museums change after COVID-19

This new environment may herald innovative economic models and change the way we think about museum design.

Museums | Jan 14, 2020

St. Louis’ new aquarium is built inside an 19th century train shed

PGAV Destinations designed the project.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021