flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dewberry acquires Houston’s Wilson Architectural Group

Architects

Dewberry acquires Houston’s Wilson Architectural Group

Now known as Dewberry | Wilson, the firm will have access to more MEP, technology design, site/civil, and land development capabilities.


By BD+C Staff | November 23, 2015
Dewberry acquires Houston’s Wilson Architectural Group

Items in Wilson Architectural Group's portfolio include Houston's Methodist Hospital. Photo: TMHJPL/Wikimedia Commons

Dewberry, a professional services firm, announced the acquisition of Wilson Architectural Group. Headquartered in Houston, Wilson is a nearly 40-person architectural firm with a portfolio of healthcare, corporate and commercial, industrial, sports and recreation, laboratories, and civic buildings in Houston and throughout Texas. During integration, the Houston office will be known as and will do business as Dewberry | Wilson.

Gary Wilson, Founding Partner of Wilson Architectural Group, said, “The partners at Wilson had been seeking a firm that could help us increase our capacity to support our clients, provide more professional growth opportunities for our employees, and support the future longevity of the practice in Houston.”

To bolster the Houston office’s programming, master planning, architectural design, construction management, and interior design services, Dewberry | Wilson’s employees will now be able to reach into the Dewberry organization for MEP, technology design, site/civil, and land development capabilities.

Jim Draheim, President of Dewberry’s architectural division, said, "Our integrated capabilities will better support existing clients in the region. Because of this office’s excellent track record in healthcare design, we also anticipate significant growth of our national healthcare practice.”

Dewberry currently has offices in the region, including Dallas and Denton, Texas, as well as a long-standing healthcare and civic architectural practice in Tulsa, Okla.

Tags

Related Stories

| Jun 13, 2013

AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition

The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York. 

| Jun 12, 2013

More than 90% of New York City schools have code violations

More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.

| Jun 12, 2013

5 building projects that put the 'team' in teamwork

The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team. 

| Jun 12, 2013

Sacred synergy achieves goals for religious education [2013 Building Team Award winner]

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.

| Jun 12, 2013

‘Talking’ Braille maps help the visual impaired

Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.

| Jun 11, 2013

Music/dance building supports sweet harmony [2013 Building Team Award winner]

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.

| Jun 11, 2013

Vertical urban campus fills a tall order [2013 Building Team Award winner]

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.

| Jun 11, 2013

Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021