flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Development startup brings modular solution to hospitality industry

Modular Building

Development startup brings modular solution to hospitality industry

Tomu Inc. provides aspiring hosts and hoteliers with modular units akin to upscale tiny house hotel rooms, that are sustainable, affordable, and customizable.


By Quinn Purcell, Managing Editor | October 11, 2023
TOMU Villa Rendering Luxury Resort
Tomu Inc.’s modular and sustainable Villa Collection provides comfortable, private, and affordable accommodations. Rendering courtesy Tomu Inc.

The hotel industry has long been dominated by major global corporations, making it difficult for newcomers to break into the field without significant financial resources and industry connections. However, building startup Tomu Inc. wants to change the landscape by offering an innovative and accessible solution: modular hotel units.

Tomu Inc., a sustainability-focused development startup that designs and builds prefabricated housing units, has started production of its luxury hotel units. The startup's modular system provides aspiring hoteliers with turnkey hotel units, akin to upscale tiny house hotel rooms, that are sustainable, affordable, and customizable to cater to various audiences, including underserved travelers. Chris Osaka, CEO of Tomu Inc., emphasizes the company's mission to empower a more diverse range of hosts and hoteliers.

“Our sustainable modular hotel units save money and time, while providing the individual owner a realistic opportunity to enter into the hospitality industry," says Osaka. The CEO underscores that Tomu can bring concepts to life, from design to delivery, within a few months.

Building Customized Modular Hotel Units

The company's approach extends to various types of accommodations, from landscape hotels and cozy bed and breakfasts to compact micro hotels and food and wine-themed properties. Tomu's selling point lies in its proprietary prefab hotel units, which allow property owners to design their rooms with different aesthetics to target specific customer segments.

Modular living unit bathroom and kitchen
Courtesy Tomu Inc.

The process involves selecting a prefab unit shell from Tomu and working closely with a design team to fully customize the physical elements and desired design parameters. The company offers three levels of unit configuration:

  • Ready To Stay: Tomu's line of detached guest units, known as the Villa Collection, come in studio, one-, and two-bedroom floor plans—all designed in a distinctive Tomu aesthetic. The Villa Collection caters to the evolving preferences of modern travelers, suitable for both short weekend getaways and longer stays.
  • Made To Suit: Developer clients have the option to customize configurations of Tomu's Villa Collection to align with project requirements. The startup collaborates with developers to tailor amenities to match the project's unique concept.
  • Fully Bespoke: Rather than maintaining Tomu's signature material palette and fixtures, this configuration gives clients full design control.

To support their vision, Tomu recently acquired a 15,000-sf production facility at the Hagerstown Regional Airport in Hagerstown, Md., in order to expand manufacturing capabilities and production by Q4 2023. Learn more about Tomu Inc. on the company's website.

Tomu Inc.'s Studio Villa Model (480 sq. ft.) - Living and Sleeping Area Rendering
Tomu Inc.'s Studio Villa Model (480 sf) — Living and Sleeping Area Rendering. Courtesy Tomu Inc.

Related Stories

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| Apr 13, 2012

Best Commercial Modular Buildings Recognized

Judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results. Read More

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Sep 29, 2011

Kohler supports 2011 Solar Decathlon competition teams

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

boombox1
boombox2
native1

More In Category

Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021