flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Completed in 1964, the 32-story tower once featured the world’s largest electronic signboard.


By HRI Properties | May 30, 2014
Led by Dallas Mayor Mike Rawlings, New Orleans-based HRI Properties will officially mark the launch of the LTV Building’s $80 million conversion into downtown Dallas’s first mixed-use hotel and residential complex.
 
New Orleans-based HRI Properties, LLC (HRI) recently completed the purchase of one of the most storied buildings in downtown Dallas and will convert it to an innovative mixed-use complex that will include a 171-room Hilton Garden Inn Hotel and 186 luxury apartments.
 
While multi-use residential conversions are still relatively rare in the U.S. outside of New York City, this will be the sixth such development by HRI. The company has converted similar projects in New Orleans,  Houston, Jackson, MS and Richmond, VA. Currently, HRI is also redeveloping the 225 Baronne Building in downtown New Orleans into a 188-room Aloft Hotel and 192 apartments.
 
“HRI Properties is a well respected developer out of New Orleans that has a successful track record in developing residential and hotel projects, and their plans for residential, hotel and retail will add greatly to the fun, vibrancy and quality of life creating a more urban environment Downtown,” said John Crawford, CEO of Downtown Dallas, Inc. 
 
“The redevelopment of 1600 Pacific is giving our downtown revitalization efforts another real boost and serves as yet another example of the importance of public/private partnerships to achieve mutual goals and objectives,” Crawford added.
 
“Today represents another accomplishment in our commitment to revitalize downtown,” Mayor Rawlings said. “This project will help attract more urban residents of all ages, incomes and backgrounds to downtown and continue to establish it as a vibrant neighborhood.”
 
The building, constructed in 1964, was known for many years as the LTV Building, headquarters of the former Ling-Temco-Vought company. The building’s façade created the world’s largest electronic signboard at the time. Thirty windows on each of the upper 25 floors were individually controlled and could be configured to shapes, letters and messages.
 
“In the thirty years since our founding, we have established a unique expertise in revitalizing urban centers through adaptive redevelopment of historic buildings,” said Tom Leonhard, CEO of HRI.  “Communities as varied as Richmond and Jackson have enthusiastically welcomed our capabilities in reviving their downtown centers, and we look forward to replicating that success in a major market like Dallas,” he said.
 
“The cooperation of local officials and partners is absolutely essential in a project of this nature,” said Leonhard. “This would not have come to a successful closing without the enthusiastic support from Mayor Rawlings, the City of Dallas Office of Economic Development, Downtown Dallas, Inc. and District 14 Councilmember Philip T. Kingston, who was instrumental in navigating the regulatory process for the conversion of this Dallas landmark into its new life as a multi-use complex,” Leonhard added.
 
The 32-story LTV Building is within walking distance to major downtown office buildings and the DART light rail. Residents will have exclusive access to 206 self-park parking spaces in the building on floors 2-4. The hotel will utilize 148 valet parking spaces in the basement of the LTV Building.
 
Construction is scheduled to be completed by third quarter 2015.
 
Architects for the project are HCI Architecture, Inc. and Merriman Associates/Architects, Inc. of Dallas. Interior design is by Looney & Associates. The general contractor is Andres Construction Services of Dallas.
 
Financing was provided through Capital One Bank and Fidelity Homestead Savings Bank, both in New Orleans.
 
HRI Lodging, HRI’s affiliated hotel management arm, will mange the Hilton Garden Inn Hotel, and HRI Management will manage the apartments.
 
The hotel amenities will include a first floor lobby with a restaurant/bar with outdoor seating. 2,000 square feet of meeting space will be constructed on the fifth floor, along with an outdoor pool deck and a fitness center for the hotel guests. Guest rooms will include all Hilton Garden Inn brand standard features including 42” flat panel TVs and in-room refrigerator.
 
The 186 apartment units will be located on floors 15 through 32 and feature condominium level finishes, washer and dryer appliances and stunning views of the Dallas skyline. Separate resident-only amenities include a fitness center, rooftop deck, and community space in addition to access to the public amenities of the hotel such as restaurant and bar space.

Related Stories

Architects | Mar 20, 2016

Ars Gratia Artis: A North Carolina architect emphasizes the value of art in its designs

Turan Duda says clients are receptive, but the art must still be integral to the building’s overall vision.

Architects | Mar 16, 2016

PGAL acquires Dallas-based Pro Forma Architecture

The merger adds a firm that has specialized in municipal projects.

Events Facilities | Mar 15, 2016

Bjarke Ingels, Foster+Partners, and Grimshaw all winners in Expo 2020 pavilion design competition

BIG designed the Opportunity Pavilion, Foster+Partners submitted the winning Mobility Pavilion, and Grimshaw created the Sustainability Pavilion.

Sports and Recreational Facilities | Mar 14, 2016

Washington Redskins tease new stadium model designed by Bjarke Ingels

The location isn't yet determined, but the new stadium will have a moat for kayaking.

Architects | Mar 11, 2016

German artist recreates Brutalist buildings with LEGO blocks

Arndt Schlaudraff brings the beauty out of the rugged, linear style of buildings most popular a half century ago.

Architects | Mar 11, 2016

Architecture for Humanity rebrands itself as Open Architecture Collaborative

With a new name, logo, and mission, the Open Architecture Collaborative is seeking a fresh start. 

Architects | Mar 11, 2016

AIA survey finds many women and minority architects still feeling underrepresented and unfulfilled

Dissatisfaction with “work-life balance” and compensation are cited as reasons why companies’ diversity strategies may be faltering.

University Buildings | Mar 11, 2016

How architects can help community colleges promote community on campus

Even in the face of funding challenges and historic precedent, there are emerging examples of how partnership between two-year academic institutions and designers can further elevate community on campus. CannonDesign's Carisima Koenig has a few key examples.

Architects | Mar 10, 2016

Value engineering: How to manage the process and limit the risk of VE

AEC consultant Steve Whitehorn shares several ways in which architects can be more effective managers of value-engineered change.

Architects | Mar 9, 2016

Two Houston firms merge to form Method Architecture

In mid-2016, Architects-Plus and Three Square Design Group will join to make a studio that will design industrial centers, corporate interiors, breweries, and more.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021