flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Developer will convert Dallas' storied LTV Building into mixed-use residential tower

Completed in 1964, the 32-story tower once featured the worldā€™s largest electronic signboard.


By HRI Properties | May 30, 2014
Led by Dallas Mayor Mike Rawlings, New Orleans-based HRI Properties will officially mark the launch of the LTV Buildingā€™s $80 million conversion into downtown Dallasā€™s first mixed-use hotel and residential complex.
Ā 
New Orleans-based HRI Properties, LLC (HRI) recently completed the purchase of one of the most storied buildings in downtown Dallas and will convert it to an innovative mixed-use complex that will include a 171-room Hilton Garden Inn Hotel and 186 luxury apartments.
Ā 
While multi-use residential conversions are still relatively rare in the U.S. outside of New York City, this will be the sixth such development by HRI. The company has converted similar projects in New Orleans, Ā Houston, Jackson, MS and Richmond, VA. Currently, HRI is also redeveloping the 225 Baronne Building in downtown New Orleans into a 188-room Aloft Hotel and 192 apartments.
Ā 
ā€œHRI Properties is a well respected developer out of New Orleans that has a successful track record in developing residential and hotel projects, and their plans for residential, hotel and retail will add greatly to the fun, vibrancy and quality of life creating a more urban environment Downtown,ā€ said John Crawford, CEO of Downtown Dallas, Inc.Ā 
Ā 
ā€œThe redevelopment of 1600 Pacific is giving our downtown revitalization efforts another real boost and serves as yet another example of the importance of public/private partnerships to achieve mutual goals and objectives,ā€ Crawford added.
Ā 
ā€œToday represents another accomplishment in our commitment to revitalize downtown,ā€ Mayor Rawlings said. ā€œThis project will help attract more urban residents of all ages, incomes and backgrounds to downtown and continue to establish it as a vibrant neighborhood.ā€
Ā 
The building, constructed in 1964, was known for many years as the LTV Building, headquarters of the former Ling-Temco-Vought company. The buildingā€™s faƧade created the worldā€™s largest electronic signboard at the time. Thirty windows on each of the upper 25 floors were individually controlled and could be configured to shapes, letters and messages.
Ā 
ā€œIn the thirty years since our founding, we have established a unique expertise in revitalizing urban centers through adaptive redevelopment of historic buildings,ā€ said Tom Leonhard, CEO of HRI. Ā ā€œCommunities as varied as Richmond and Jackson have enthusiastically welcomed our capabilities in reviving their downtown centers, and we look forward to replicating that success in a major market like Dallas,ā€ he said.
Ā 
ā€œThe cooperation of local officials and partners is absolutely essential in a project of this nature,ā€ said Leonhard. ā€œThis would not have come to a successful closing without the enthusiastic support from Mayor Rawlings, the City of Dallas Office of Economic Development, Downtown Dallas, Inc. and District 14 Councilmember Philip T. Kingston, who was instrumental in navigating the regulatory process for the conversion of this Dallas landmark into its new life as a multi-use complex,ā€ Leonhard added.
Ā 
The 32-story LTV Building is within walking distance to major downtown office buildings and the DART light rail. Residents will have exclusive access to 206 self-park parking spaces in the building on floors 2-4. The hotel will utilize 148 valet parking spaces in the basement of the LTV Building.
Ā 
Construction is scheduled to be completed by third quarter 2015.
Ā 
Architects for the project are HCI Architecture, Inc. and Merriman Associates/Architects, Inc. of Dallas. Interior design is by Looney & Associates. The general contractor is Andres Construction Services of Dallas.
Ā 
Financing was provided through Capital One Bank and Fidelity Homestead Savings Bank, both in New Orleans.
Ā 
HRI Lodging, HRIā€™s affiliated hotel management arm, will mange the Hilton Garden Inn Hotel, and HRI Management will manage the apartments.
Ā 
The hotel amenities will include a first floor lobby with a restaurant/bar with outdoor seating. 2,000 square feet of meeting space will be constructed on the fifth floor, along with an outdoor pool deck and a fitness center for the hotel guests. Guest rooms will include all Hilton Garden Inn brand standard features including 42ā€ flat panel TVs and in-room refrigerator.
Ā 
The 186 apartment units will be located on floors 15 through 32 and feature condominium level finishes, washer and dryer appliances and stunning views of the Dallas skyline. Separate resident-only amenities include a fitness center, rooftop deck, and community space in addition to access to the public amenities of the hotel such as restaurant and bar space.

Related Stories

Airports | Jul 18, 2022

FAA will award nearly $1 billion for airport projects

The Federal Aviation Administration (FAA) will award nearly $1 billion to 85 airports of all sizes across the country to improve terminals.

Building Team | Jul 18, 2022

Understanding the growing design-build market

FMIā€™s new analysis of the design-build market forecast for the next fives years shows that this delivery method will continue to grow, despite challenges from the COVID-19 pandemic.

Mixed-Use | Jul 18, 2022

Mixed-use development outside Prague uses a material made from leftover bricks

Outside Prague, the Sugar Factory, a mixed-used residential development with public space, marks the largest project to use the sustainable material Rebetong.Ā 

Building Team | Jul 15, 2022

ABC: Construction materials prices increased in June, up 20% from a year ago

Construction input prices increased 1.9% in June compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statisticsā€™ Producer Price Index data released today.

Arenas | Jul 15, 2022

U. of Oregon renovation aims for ā€˜finest track and field facility in the worldā€™

The renovation of the University of Oregonā€™s Hayward Field had the goal of creating the ā€œfinest track and field facility in the world.ā€

Building Team | Jul 14, 2022

ABCā€™s construction backlog inches lower in June; Contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator fell 0.1 months in June and stands at 8.9 months, according to an ABC member survey conducted June 21 to July 5.

Sustainable Development | Jul 14, 2022

Designing for climate change and inclusion, with CBT Architects' Kishore Varanasi and Devanshi Purohit

Climate change is having a dramatic impact on urban design, in terms of planning, materials, occupant use, location, and the long-term effect of buildings on the environment. Joining BD+C's John Caulfield to discuss this topic are two experts from the Boston-based CBT Architects: Kishore Varanasi, a Principal and director of urban design; and Devanshi Purohit, an Associate Principal.

Multifamily Housing | Jul 14, 2022

Multifamily rents rise again in June, Yardi Matrix reports

Average U.S. multifamily rents rose another $19 in June to edge over $1,700 for the first time ever, according to the latest YardiĀ® Matrix Multifamily Report.

Building Team | Jul 14, 2022

Austin PBS gets a new state-of-the-art facility with three studios

Since the 1970s, Austin PBS, birthplace of the Austin City Limits TV series, has been based inside the communications building on the University of Texas campusā€”a space it has long outgrown.

Building Team | Jul 13, 2022

The YIMBY movement emerges as valuable advocate for affordable housing

Over the past few decades, developers grew accustomed to nothing but staunch opposition to dense affordable housing project proposals.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā