17 John, Rodrigo Nino's proposed extended stay hotel in Manhattan, will ask individual investors to provide $100,000 to fund the structure's interior.
Crowdsourcing has worked for Nino before, both in the Prodigy Group and in the Ideal City Project, which he founded. The latter is a crowdsourcing platform for solving urban issues. AKA Wall Street, a $90 million extended stay hotel, is Ideal City's latest project.
The Prodigy Group is responsible for the BD Bacata project, a 66-story, 1.2 million-sf tower with 3,500 investors. The building will open in Bogota, Colombia, in 2015. It includes office and retail space, as well as a 364-room hotel.
Architect Winka Dubbeldam of Archi-Tectonics NL designed the 23-story 17 John project.
“We have learned that crowdfunding not only democratizes investments, it also makes projects viable that otherwise would not be possible,” Nino told Dwell. “With 17 John, we are providing real estate investment opportunities to accredited investors.
Here are Dubbeldam's latest renderings of 17 John:
Related Stories
| Mar 29, 2012
Construction completed on Las Vegas’ newest performing arts center
The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.
| Mar 29, 2012
Apartments provide permanent housing for California homeless
Gonzalez Goodale Architects designed complex to embrace community and engender sense of pride among residents.
| Mar 28, 2012
40 Under 40, the Class of 2012
Chosen from 223 applicants, these 40 young AEC professionals represent the Class of 2012 in Building Design+Construction’s “40 UNDER 40” competition.
| Mar 28, 2012
Milestone reached for LEED-certified buildings?
Total number of major global green buildings now stands at 12,000.
| Mar 28, 2012
Holden Cancer Center opens at University of Iowa Hospitals and Clinics
The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.
| Mar 28, 2012
Meridian Design Build Begins work on 38 acre redevelopment project
The project includes construction of a new 150,585-sf cross dock facility that will include full service truck maintenance and repair bays, a truck wash, and approximately 20,000-sf of corporate office space.
| Mar 28, 2012
Tsoi/Kobis & Associates developing master plan for UT Southwestern Medical Center
Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.
| Mar 28, 2012
Ideas and input drive stories in online community, noraXchange
Community designed to help building and design professionals address challenges they face in their jobs.
| Mar 27, 2012
Bank of America Plaza becomes Atlanta's priciest repo
Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.
| Mar 27, 2012
Skanska hires aviation construction expert Bob Postma
Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.