Five years ago, developer Sharif El-Gamal found himself the target of public and political opprobrium when his company, Soho Properties, proposed building Park51, a 15-story Islamic Center and mosque two blocks from the Ground Zero site where the World Trade Center towers were destroyed by the deadliest terrorist attack in the country’s history.
On that same lot—45 Park Place in lower Manhattan, for which El-Gamal paid only $4.85 million in 2009—Soho now proposes to build a 70-story, 667-foot-tall glass condominium tower. According to Bloomberg Business, the skyscraper would offer at least 15 full-floor units of 3,200 to 3,700 sf each, with an average price tag of $3,000 per square foot. The total number of units being proposed was not disclosed.
If the building and pricing are approved, this project is expected to break ground by the end of this year, start selling units early next year, and be completed in 2017. Michael Abboud of the architectural firm SOMA designed the building. The Italian designer Piero Lissoni will design the interiors. Ismael Leyva Architects reportedly is converting SOMA’s exterior design concepts into floor layouts and detailed construction plans.
The proposal calls for 12-foot-tall windows and unobstructed views to the north that begin at close to 300 feet. There will be a 50-foot swimming pool in the basement, concierge service, and a high-ceilinged private lounge.
Bloomberg also reports that Soho still plans to build a three-story Islamic museum and prayer space that would be connected to the tower via a public plaza.
Soho Properties first disclosed preliminary plans for its tower in August 2014, but was still feeling the sting of negative press surrounding the Islamic Center controversy. Those preliminary plans, though, called for a 39-story, 48-unit condo building, considerably shorter than the tower Soho wants to build now.
Soho is attempting to strike while the luxury condo boom is still hot. Home prices in downtown have risen by 28% since 2012. StreetEasy.com, which tracks sales and pricing activity in New York, estimates that homes in the downtown area are on the market for an average of 56 days before they’re sold, or about half the time it took in 2012.
About 5,500 units are being planned or are under construction in the downtown area south of Chambers Street, which suggests that Soho’s proposed tower would run the risk of jumping into a very crowded field.
Related Stories
Multifamily Housing | Jul 31, 2019
100% affordable housing development features 62-units for low-income households
Magnusson Architecture + Planning is designing the project.
Multifamily Housing | Jul 24, 2019
Multifamily transformation: Historic mansion converted to short-term housing for homeless families
The 1885 Victorian home in Cambridge, Mass., gets a new, energy-efficient life as Renae's Place, short-term housing for homeless women and their children.
Multifamily Housing | Jul 23, 2019
Is prefab in your future?
The most important benefit of offsite construction, when done right, is reliability.
Multifamily Housing | Jul 17, 2019
What multifamily developers are saying about Ori Living's robotic interior system
This robotically controlled, space-saving furniture system can add more than 100 square feet of usable space to apartment units.
Multifamily Housing | Jul 17, 2019
Robotic interiors: How to make a studio apartment feel as big as a one-bedroom unit
Meet Ori Living's robotically controlled, space-saving furniture system.
Multifamily Housing | Jul 17, 2019
Cost of living: Apartment construction costs for 2019
Using RSMeans data from Gordian, here are the most recent construction costs for low-rise and mid-rise apartment buildings across 10 U.S. cities.
Multifamily Housing | Jul 15, 2019
Call for entries: Student housing roundup
We're looking for the best new "student housing" communities for our Fall Issue of Multifamily Design+Construction.
Multifamily Housing | Jul 15, 2019
7 new multifamily developments to track this summer
Ballpark living in Anaheim, Calif., and a water-friendly apartment complex in Seattle highlight the noteworthy multifamily developments to open in 2019.
Multifamily Housing | Jun 27, 2019
David Baker Architects wins 2019 HUD 'best in affordable housing' honor
The firm's Williams Terrace project is the first dedicated housing for Charleston, S.C.’s low-income seniors. It's one of four developments to win 2019 AIA/HUD housing awards.
Building Tech | Jun 26, 2019
Modular construction can deliver projects 50% faster
Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.