Five years ago, developer Sharif El-Gamal found himself the target of public and political opprobrium when his company, Soho Properties, proposed building Park51, a 15-story Islamic Center and mosque two blocks from the Ground Zero site where the World Trade Center towers were destroyed by the deadliest terrorist attack in the country’s history.
On that same lot—45 Park Place in lower Manhattan, for which El-Gamal paid only $4.85 million in 2009—Soho now proposes to build a 70-story, 667-foot-tall glass condominium tower. According to Bloomberg Business, the skyscraper would offer at least 15 full-floor units of 3,200 to 3,700 sf each, with an average price tag of $3,000 per square foot. The total number of units being proposed was not disclosed.
If the building and pricing are approved, this project is expected to break ground by the end of this year, start selling units early next year, and be completed in 2017. Michael Abboud of the architectural firm SOMA designed the building. The Italian designer Piero Lissoni will design the interiors. Ismael Leyva Architects reportedly is converting SOMA’s exterior design concepts into floor layouts and detailed construction plans.
The proposal calls for 12-foot-tall windows and unobstructed views to the north that begin at close to 300 feet. There will be a 50-foot swimming pool in the basement, concierge service, and a high-ceilinged private lounge.
Bloomberg also reports that Soho still plans to build a three-story Islamic museum and prayer space that would be connected to the tower via a public plaza.
Soho Properties first disclosed preliminary plans for its tower in August 2014, but was still feeling the sting of negative press surrounding the Islamic Center controversy. Those preliminary plans, though, called for a 39-story, 48-unit condo building, considerably shorter than the tower Soho wants to build now.
Soho is attempting to strike while the luxury condo boom is still hot. Home prices in downtown have risen by 28% since 2012. StreetEasy.com, which tracks sales and pricing activity in New York, estimates that homes in the downtown area are on the market for an average of 56 days before they’re sold, or about half the time it took in 2012.
About 5,500 units are being planned or are under construction in the downtown area south of Chambers Street, which suggests that Soho’s proposed tower would run the risk of jumping into a very crowded field.
Related Stories
Legislation | May 20, 2022
Arlington County, Virginia may legalize multifamily housing countywide
Arlington County, Va., a Washington, D.C.-area community, is considering proposed legislation that would remove zoning restrictions on multifamily housing up to eight units in size.
Multifamily Housing | May 11, 2022
Kitchen+Bath AMENITIES – Take the survey for a chance at a $50 gift card
MULTIFAMILY DESIGN + CONSTRUCTION is conducting a research study on the use of kitchen and bath products in the $106 billion multifamily construction sector.
Sponsored | BD+C University Course | May 10, 2022
6 steps to designing a modern wine display
Design-focused wine displays are becoming increasingly popular in amazing residential and commercial properties throughout the world. Top design/build professionals are using stylish wine racks and other premium materials to create wine cellars that are too beautiful to hide in out-of-the-way places like dusty basements. This course explains why wine cellars have become so popular and the key aspects of designing an appealing modern wine cellar, broken into six planning steps that should be considered during pre- or early-construction phases.
Multifamily Housing | May 10, 2022
Multifamily rents up 14.3% in 2022
The average U.S. asking rent for multifamily housing increased $15 in April to an all-time high of $1,659, according to Yardi Matrix.
Sponsored | Multifamily Housing | May 8, 2022
Choosing the right paver system for rooftop amenity spaces
This AIA course by Hoffmann Architects offers best practices for choosing the right paver system for rooftop amenity spaces in multifamily buildings.
Building Team | May 6, 2022
Atlanta’s largest adaptive reuse project features cross laminated timber
Global real estate investment and management firm Jamestown recently started construction on more than 700,000 sf of new live, work, and shop space at Ponce City Market.
Multifamily Housing | May 5, 2022
An Austin firm touts design and communal spaces in its student housing projects
Rhode Partners has multiple towers in various development stages.
Sponsored | BD+C University Course | May 3, 2022
For glass openings, how big is too big?
Advances in glazing materials and glass building systems offer a seemingly unlimited horizon for not only glass performance, but also for the size and extent of these light, transparent forms. Both for enclosures and for indoor environments, novel products and assemblies allow for more glass and less opaque structure—often in places that previously limited their use.
Multifamily Housing | May 3, 2022
Call for Kitchen+Bath projects and products – for next issue of "MULTIFAMILY Design+Construction" (no charge to participate!)
Multifamily AEC firms and developers and product manufacturers can submit Kitchen+Bath projects and products – for the next issue of "MULTIFAMILY Design+Construction."
Multifamily Housing | May 1, 2022
Kraus-Anderson helps fill void in tight Twin Cities housing market
One project just came online, and another apartment building should be completed this summer.