Five years ago, developer Sharif El-Gamal found himself the target of public and political opprobrium when his company, Soho Properties, proposed building Park51, a 15-story Islamic Center and mosque two blocks from the Ground Zero site where the World Trade Center towers were destroyed by the deadliest terrorist attack in the country’s history.
On that same lot—45 Park Place in lower Manhattan, for which El-Gamal paid only $4.85 million in 2009—Soho now proposes to build a 70-story, 667-foot-tall glass condominium tower. According to Bloomberg Business, the skyscraper would offer at least 15 full-floor units of 3,200 to 3,700 sf each, with an average price tag of $3,000 per square foot. The total number of units being proposed was not disclosed.
If the building and pricing are approved, this project is expected to break ground by the end of this year, start selling units early next year, and be completed in 2017. Michael Abboud of the architectural firm SOMA designed the building. The Italian designer Piero Lissoni will design the interiors. Ismael Leyva Architects reportedly is converting SOMA’s exterior design concepts into floor layouts and detailed construction plans.
The proposal calls for 12-foot-tall windows and unobstructed views to the north that begin at close to 300 feet. There will be a 50-foot swimming pool in the basement, concierge service, and a high-ceilinged private lounge.
Bloomberg also reports that Soho still plans to build a three-story Islamic museum and prayer space that would be connected to the tower via a public plaza.
Soho Properties first disclosed preliminary plans for its tower in August 2014, but was still feeling the sting of negative press surrounding the Islamic Center controversy. Those preliminary plans, though, called for a 39-story, 48-unit condo building, considerably shorter than the tower Soho wants to build now.
Soho is attempting to strike while the luxury condo boom is still hot. Home prices in downtown have risen by 28% since 2012. StreetEasy.com, which tracks sales and pricing activity in New York, estimates that homes in the downtown area are on the market for an average of 56 days before they’re sold, or about half the time it took in 2012.
About 5,500 units are being planned or are under construction in the downtown area south of Chambers Street, which suggests that Soho’s proposed tower would run the risk of jumping into a very crowded field.
Related Stories
| Jul 19, 2012
Rental market pushing service, ‘community’
The Top 25 Giants 300 AEC firms in the Multifamily Sector keep four-legged tenants in mind.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 9, 2012
Oakdale, Calif., Heritage Oaks Senior Apartments opens
New complex highlights senior preferences for amenities.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 2, 2012
Building Team completes two additions at UCLA
New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.
| May 2, 2012
Public housing can incorporate sustainable design
Sustainable design achievable without having to add significant cost; owner and residents reap benefits