Five years ago, developer Sharif El-Gamal found himself the target of public and political opprobrium when his company, Soho Properties, proposed building Park51, a 15-story Islamic Center and mosque two blocks from the Ground Zero site where the World Trade Center towers were destroyed by the deadliest terrorist attack in the country’s history.
On that same lot—45 Park Place in lower Manhattan, for which El-Gamal paid only $4.85 million in 2009—Soho now proposes to build a 70-story, 667-foot-tall glass condominium tower. According to Bloomberg Business, the skyscraper would offer at least 15 full-floor units of 3,200 to 3,700 sf each, with an average price tag of $3,000 per square foot. The total number of units being proposed was not disclosed.
If the building and pricing are approved, this project is expected to break ground by the end of this year, start selling units early next year, and be completed in 2017. Michael Abboud of the architectural firm SOMA designed the building. The Italian designer Piero Lissoni will design the interiors. Ismael Leyva Architects reportedly is converting SOMA’s exterior design concepts into floor layouts and detailed construction plans.
The proposal calls for 12-foot-tall windows and unobstructed views to the north that begin at close to 300 feet. There will be a 50-foot swimming pool in the basement, concierge service, and a high-ceilinged private lounge.
Bloomberg also reports that Soho still plans to build a three-story Islamic museum and prayer space that would be connected to the tower via a public plaza.
Soho Properties first disclosed preliminary plans for its tower in August 2014, but was still feeling the sting of negative press surrounding the Islamic Center controversy. Those preliminary plans, though, called for a 39-story, 48-unit condo building, considerably shorter than the tower Soho wants to build now.
Soho is attempting to strike while the luxury condo boom is still hot. Home prices in downtown have risen by 28% since 2012. StreetEasy.com, which tracks sales and pricing activity in New York, estimates that homes in the downtown area are on the market for an average of 56 days before they’re sold, or about half the time it took in 2012.
About 5,500 units are being planned or are under construction in the downtown area south of Chambers Street, which suggests that Soho’s proposed tower would run the risk of jumping into a very crowded field.
Related Stories
| Dec 20, 2013
Can energy hogs still be considered efficient buildings? Yes, say engineers at Buro Happold
A new tool from the engineering firm Buro Happold takes into account both energy and economic performance of buildings for a true measure of efficiency.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 4, 2013
First look: Dubai's winning bid for World Expo 2020 [slideshow]
Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Nov 19, 2013
Top 10 green building products for 2014
Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list.
| Nov 15, 2013
Greenbuild 2013 Report - BD+C Exclusive
The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors.