flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Developer, architect hit with $10 million construction defect verdict

Codes and Standards

Developer, architect hit with $10 million construction defect verdict

Case pertained to construction of condo development that was not fire code-compliant.


By Peter Fabris, Contributing Editor | June 19, 2017

Pixabay Public Domain

The developer of a New Jersey condominium development and its architecture firm face a $10 million construction defect verdict in a case involving non-compliance with fire codes.

The Grandview I building on the Hudson River, developed by Hovnanian Enterprises’ subsidiary, K. Hovnanian and designed by RTKL New Jersey Architects, was alleged to have been built in a condition that was not compliant with fire codes. The plaintiff—the condominium association--alleges that the developer knew about the non-compliance and failed to disclose this fact with buyers.

According to the plaintiff’s attorneys, the architect designed the building with plywood subflooring and later warned the developer that to comply with code the structure would have to be reclassified from Type 2 to Type 3. The reclassification would have allowed plywood if the building’s exterior steel-with-brick-veneer walls were rebuilt with code-required masonry walls.

The building codes provide for five types of buildings, ranging from the most fire-resistant Type 1 — often a skyscraper — to Type 5, typically a wood-framed house. Defense attorneys argued that the plywood flooring was not a life-safety issue, since fire alarms and exits would allow all residents to safely vacate the building. The condo association's attorneys agreed that there was no threat to residents' lives, but that property could suffer more damage as a result of the code violation.

Related Stories

Codes and Standards | Apr 18, 2016

ASHRAE releases proposed energy standard for historic buildings

Designed to balance with preservation requirements.  

Codes and Standards | Apr 13, 2016

Canadian city fines itself for failing to get a building permit for building renovation

Guelph, Ontario, will pay a $1,125 fine to the province.

Codes and Standards | Apr 12, 2016

Construction trade groups sue OSHA over silica rule

Cite concerns about technological and economic feasibility.

Wood | Apr 8, 2016

New LEED Pilot ACP designed to help eliminate irresponsibly sourced materials

Illegal wood is primary target to restrict illicit material in the supply chain.  

Lighting | Apr 5, 2016

Lighting requirements for high-rise dwellings proposed for energy standard

The requirements would effectively eliminate incandescent and halogen bulbs.

Steel Buildings | Apr 4, 2016

AISI publishes Cold-Formed Steel Framing Design Guide, 2016 Edition

Updates 2007 edition; includes five comprehensive design examples.  

Data Centers | Apr 1, 2016

ASHRAE releases publication on the impact of IT equipment on data center design

The book offers advice for designing structures in the fast-changing data center industry.

Codes and Standards | Mar 28, 2016

Occupant egress simulations that impact codes fall short, researchers say

Building evacuations in emergencies are too dangerous as a result.  

School Construction | Mar 28, 2016

National report on school buildings reports $46 billion annual funding shortfall

Millions of students said to be learning in obsolete facilities.  

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021