flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

High-rise Construction

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.


By David Malone, Associate Editor | March 3, 2017

Rendering courtesy of SHoP Architects Bedrock Detroit

J.L. Hudson’s Department Store was one of the premier locations in the heart of downtown Detroit in the 1970s and 1980s. After closing in 1983, however, it has sat as one of the few vacant sites in downtown Detroit.

But the site is about to be vacant no longer, as a new design from SHoP Architects and Hamilton Anderson Associates calls for a 52-story mixed-use building to rise and create a new destination location in the heart of Detroit.

The building, which will stretch 734-feet into the sky and become Detroit’s tallest tower, will offer 250 residential units totaling 441,500 GSF. A nine-story, 176-foot podium will contain another 733,823 GSF for use as commercial, office, technology, and arts and culture space. An additional three stories will be located below grade and comprise more commercial space and 700 parking spots. About two-thirds of the first underground floor will be used as a market. The remainder of the first underground floor, as well as the second and third floors, will be used for parking. In total, the building will provide 1.2 million GSF.

The Hudson’s Site building will be one of the largest construction projects in Detroit in decades and will attempt to once again turn the Woodward Avenue site into a premier location in the city. The new mixed-use tower is expected to attract visitors, create thousands of jobs, and lure talent, business, and investment opportunities. Bedrock Detroit, the project’s developer, estimates the project will create 5,800 jobs during the construction phase and 3,000 new permanent jobs. It is also estimated the Hudson’s Site project will create $560 million in annual economic output.

The Downtown Development Authority was presented with plans for the site and has approved the timeline for the groundbreaking of the development by Dec. 1, 2017.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

 

Rendering courtesy of SHoP Architects and Bedrock Detroit.

Related Stories

High-rise Construction | Feb 17, 2015

Work begins on Bjarke Ingels' pixelated tower in Calgary

Construction on Calgary’s newest skyscraper, the 66-story Telus Sky Tower, recently broke ground. 

Wood | Feb 3, 2015

16 stunning wood buildings win 2015 Wood Design Awards

Jackson Hole (Wyo.) Airport and Stapleton Library in Staten Island, N.Y., are among the projects honored by WoodWorks.

Office Buildings | Jan 27, 2015

London plans to build Foggo Associates' 'can of ham' building

The much delayed high-rise development at London’s 60-70 St. Mary Axe resembles a can of ham, and the project's architects are embracing the playful sobriquet.

| Jan 20, 2015

Avery Associates unveils plans for London's second-tallest tower

The 270-meter tower, dubbed the No. 1 Undershaft, will stand next to the city's "Cheesegrater" building.

| Jan 13, 2015

A new record: 97 buildings taller than 200 meters completed in 2014

Last year was a record-breaking year for high-rise construction, with 97 tall buildings completed worldwide, including 11 "supertalls," according to a new report from the Council on Tall Buildings and Urban Habitat.

| Jan 9, 2015

Technology and media tenants, not financial companies, fill up One World Trade Center

The financial sector has almost no presence in the new tower, with creative and media companies, such as magazine publisher Conde Nast, dominating the vast majority of leased space.

| Dec 28, 2014

Robots, drones, and printed buildings: The promise of automated construction

Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.

| Dec 27, 2014

'Core-first' construction technique cuts costs, saves time on NYC high-rise project

When Plaza Construction first introduced the concept of "core first" in managing the construction of a major office building, the procedure of pouring concrete prior to erecting a steel frame had never been done in New York City.

| Dec 22, 2014

Studio Gang to design Chicago’s third-tallest skyscraper

The first U.S. real-estate investment by The Wanda Group, owned by China’s richest man, will be an 88-story, 1,148-ft-tall mixed-use tower designed by Jeanne Gang.

| Dec 18, 2014

11 new highs for tall buildings: CTBUH recaps the year's top moments in skyscraper construction

The Council on Tall Buildings and Urban Habitat cherrypicked the top moments from 2014, including a record concrete pour, a cautionary note about high-rise development, and two men's daring feat.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021