flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Details unveiled for Atlanta’s Campus 244 mixed-use development

Mixed-Use

Details unveiled for Atlanta’s Campus 244 mixed-use development

S9 Architecture is designing the project.


By David Malone, Managing Editor | January 13, 2022
Campus 244
Renderings courtesy S9 Architecture

The Georgetown Company and RocaPoint Partners have unveiled new details about Campus 244, a one-million+-sf mixed-use development in Atlanta’s Central Perimeter submarket.

The walkable campus is located on 12.8 acres and will feature a new 145-key Element Hotel, a 400,000-sf adaptive reuse office building, and 25,000-sf of new food and beverage establishments.

Campus 244 exterior

The first phase of the project will include the adaptive reimagining of the existing Gold Kist office building into a five-story, 400,000-sf Class-A office building with a timber overbuild. The workspace will feature 15-foot ceilings, private outdoor terraces, balcony space, and expansive 90,000-sf floor plates that emphasize natural daylight and fresh air throughout. Several post-pandemic workspace features will be included, such as state-of-the-art HVAC systems, touchless elevator and restroom technologies, open staircases, and operable windows.

Campus 244

The first phase will also include an upscale, boutique, 145-key Element Hotel. The hotel will feature a lobby bar that will spill out onto the large greenspace; diverse areas to gather for meetings, remote work, and collaboration; and spots to get coffee with friends and colleagues.

Subsequent phases will include 25,000-sf of restaurant space. The chef-driven restaurant concepts will be located surrounding a central plaza greenspace, providing a connected gathering space for employees on-campus, as well as the local community.

Campus 244 rooftop

Campus 244 will offer convenient, transit-oriented access to Atlanta’s “Pill Hill” healthcare community, State Farm’s office campus, Perimeter Mall, and other surrounding office and retail amenities.

S9 Architecture will handle the design and master planning for Campus 244.

Campus 244 interior

Tags

Related Stories

Mixed-Use | May 15, 2019

Puerto Rican mixed-use, mixed income housing development begins construction

Álvarez-Díaz & Villalón designed the project.

Mixed-Use | May 14, 2019

Mixed-use community breaks ground in Greenville, S.C.

The Beach Company is developing the project.

Mixed-Use | May 9, 2019

Development builds on success of Chicago’s River North

One Chicago will further enliven upscale, artsy area.

Mixed-Use | May 3, 2019

The Colorado Rockies get into the sports-anchored development game

The project is currently under construction across the street from Coors Field.

Mixed-Use | May 2, 2019

A series of green bridges will connect these two towers in Shenzhen, China

Steven Holl Architects designed the project.

Mixed-Use | Apr 26, 2019

Miami’s 7-acre Link at Douglas breaks ground

The project will be built in phases over the next five years.

Mixed-Use | Apr 7, 2019

Chicago-area joint venture antes up $1 billion for Opportunity Zone development investment

Decennial Group says it’s looking at 250 potential projects, primarily in America’s heartland and rural areas.

Mixed-Use | Mar 11, 2019

Podcast: Sterling Bay’s Andy Gloor discusses Chicago’s grandiose Lincoln Yards Plan

Lincoln Yards is Sterling Bay’s ambitious riverfront development of formerly industrial land between Bucktown and Lincoln Park.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

Mixed-Use | Feb 19, 2019

Sunset Library in Brooklyn will be capped with 50 affordable residences

Magnusson Architecture and Planning is designing the facility.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021