flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Details unveiled for Atlanta’s Campus 244 mixed-use development

Mixed-Use

Details unveiled for Atlanta’s Campus 244 mixed-use development

S9 Architecture is designing the project.


By David Malone, Managing Editor | January 13, 2022
Campus 244
Renderings courtesy S9 Architecture

The Georgetown Company and RocaPoint Partners have unveiled new details about Campus 244, a one-million+-sf mixed-use development in Atlanta’s Central Perimeter submarket.

The walkable campus is located on 12.8 acres and will feature a new 145-key Element Hotel, a 400,000-sf adaptive reuse office building, and 25,000-sf of new food and beverage establishments.

Campus 244 exterior

The first phase of the project will include the adaptive reimagining of the existing Gold Kist office building into a five-story, 400,000-sf Class-A office building with a timber overbuild. The workspace will feature 15-foot ceilings, private outdoor terraces, balcony space, and expansive 90,000-sf floor plates that emphasize natural daylight and fresh air throughout. Several post-pandemic workspace features will be included, such as state-of-the-art HVAC systems, touchless elevator and restroom technologies, open staircases, and operable windows.

Campus 244

The first phase will also include an upscale, boutique, 145-key Element Hotel. The hotel will feature a lobby bar that will spill out onto the large greenspace; diverse areas to gather for meetings, remote work, and collaboration; and spots to get coffee with friends and colleagues.

Subsequent phases will include 25,000-sf of restaurant space. The chef-driven restaurant concepts will be located surrounding a central plaza greenspace, providing a connected gathering space for employees on-campus, as well as the local community.

Campus 244 rooftop

Campus 244 will offer convenient, transit-oriented access to Atlanta’s “Pill Hill” healthcare community, State Farm’s office campus, Perimeter Mall, and other surrounding office and retail amenities.

S9 Architecture will handle the design and master planning for Campus 244.

Campus 244 interior

Tags

Related Stories

Mixed-Use | Dec 28, 2020

BIG designs new mixed-use development in Harlem

The project, dubbed The Smile, has recently completed construction.

Urban Planning | Dec 6, 2020

Ford lays out plans for mobility innovation district in Detroit

Its centerpiece is an abandoned train depot whose architecture and decay reflect two sides of this city’s past.

Mixed-Use | Oct 19, 2020

Commonwealth Pier revitalization project begins construction in Boston’s Seaport

CBT, in collaboration with Schmidt Hammer Lassen Architects designed the project.

Mixed-Use | Oct 2, 2020

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

The project reinterprets the structural forms and layering of a Bauhinia bud about to blossom.

Reconstruction & Renovation | Sep 30, 2020

SOM reimagines former Cook County Hospital into mixed-use destination

The project is the first phase of a proposed $1 billion redevelopment plan for the area in Chicago.

Mixed-Use | Sep 23, 2020

SOM-designed waterfront neighborhood will include 1,045-foot-tall tower

The project will focus on harnessing the sea and the sun to create a low-carbon waterfront community.

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

Mixed-Use | Aug 17, 2020

New Sydney towers will have the world’s first AI-driven facade system

SOM and Fender Katsalidis are designing the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021