flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Designs unveiled for new residential tower in Honolulu

Multifamily Housing

Designs unveiled for new residential tower in Honolulu

Studio Gang pays homage to sugarcane plants that were once prevalent in this area.


By John Caulfield, Senior Editor | November 20, 2018

The 41-story Ko'ula residential tower is part of a 60-acre waterfront redevelopment in downtown Honolulu. Image: The Howard Hughes Corporation

Studio Gang has designed a 41-story residential high rise called Ko’ula that would be a central component within the 60-acre Ward Village master-planned community in Honolulu on the island of Oahu in Hawaii.

The tower will include 565 studio, one-, two-, and three-bedroom residences, each with its own lanai, or veranda. The design of the building—which twists as it rises and undulates to create a succession of different floor plans—recalls the shape of red sugarcane plants that once grew in this area.

The Howard Hughes Corporation is the developer on this tower and Ward Village. The design firm Yabu Pushelberg designed Ko’ula’s interiors, which will showcase natural materials, colors, and textures. The project has yet to name its other Building Team members.

A porte cochiere connects the high rise to an expansive courtyard. Image: The Howard Hughes Corporation

 

The high rise will connect to a public porch that opens onto an expansive courtyard that will serve as another entry point for Ward Village’s Central Plaza, which began construction earlier this year and whose first phase is expected to open to the public in January. The completed tower will include 58,300 sf of dining and retail spaces, 11,000 sf of open spaces, and 58,496 sf of recreational spaces.

Ko’ula’s residents will have exclusive access to a lobby and dropoff area located a level above the street.

A sales office that the design firm Woods Bagot converted from a 1960s-era office building will start taking purchase orders for Ko’ula’s residences later this year. Ko’ula is scheduled to break ground sometime in 2019, although no specific date has been set. Hughes has not disclosed a completion date nor the project’s anticipated cost.

One of the amenities decks within the Ko'ula high rise, which will offer 565 apartments. Image: The Howard Hughes Corporation

 

The Ward Village district is located between downtown Honolulu and Waikīkī. As part of the district’s redevelopment, Howard Hughes Corporation last summer topped off a 43-story mixed-use tower called Ke Kilohana, with 424 residential units, 375 of which targeting workforce buyers.  

When it’s completed, Ward Village will have 4,500 residences and one million sf of retail space. It is part of Ka’kaako, Honolulu’s commercial and retail district for which the city has laid out ambitious expansion plans that include 30 new buildings.

Related Stories

Codes and Standards | Apr 13, 2022

LEED multifamily properties fetch higher rents and sales premiums

LEED-certified multifamily properties consistently receive higher rents than non-certified rental complexes, according to a Cushman & Wakefield study of two decades of data on Class A multifamily assets with 50 units or more.

Multifamily Housing | Apr 7, 2022

Ken Soble Tower becomes world’s largest residential Passive House retrofit

The project team for the 18-story high-rise for seniors slashed the building’s greenhouse gas emissions by 94 percent and its heating energy demand by 91 percent.

Multifamily Housing | Apr 5, 2022

New Covenant House New York contains multiple services for youth in crisis

The new Covenant House New York, a crisis shelter for homeless youth in the Hell’s Kitchen neighborhood, provides a temporary home and multiple services for young people.

Sponsored | BD+C University Course | Apr 1, 2022

Video surveillance systems for multifamily housing projects

This introductory course provides detailed technical information and advice from security expert Michael Silva, CPP, on designing a video surveillance system for multifamily housing communities – apartments, condominiums, townhouses, or senior living communities. Technical advice on choosing the right type of cameras and optimizing the exterior lighting for their use is offered.

Modular Building | Mar 31, 2022

Rick Murdock’s dream multifamily housing factory

Modular housing leader Rick Murdock had a vision: Why not use robotic systems to automate the production of affordable modular housing? Now that vision is a reality.

Multifamily Housing | Mar 31, 2022

Mixed-use affordable housing project aims for zero waste

The Peninsula in the Bronx, N.Y., a mixed-use affordable housing campus, just opened its first phase.

Multifamily Housing | Mar 29, 2022

Ken McCarren to succeed Craig Jones as president of MBK Rental Living

Ken McCarren to succeed Craig Jones as president of MBK Rental Living

Multifamily Housing | Mar 29, 2022

Here’s why the U.S. needs more ‘TOD’ housing

Transit-oriented developments help address the housing affordability issue that many cities and suburbs are facing.

Multifamily Housing | Mar 28, 2022

Singapore’s new Irwell Hill residences will be built around heritage rain trees

The recently unveiled design of Irwell Hill, twin 36-story residence towers, calls for the development to be situated among copious greenery including preserved heritage rain trees.

Codes and Standards | Mar 23, 2022

High office vacancies have cities rethinking downtown zoning

As record-high office vacancies persist in U.S. urban areas, cities are rethinking zoning policy.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021