flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Designs unveiled for new residential tower in Honolulu

Multifamily Housing

Designs unveiled for new residential tower in Honolulu

Studio Gang pays homage to sugarcane plants that were once prevalent in this area.


By John Caulfield, Senior Editor | November 20, 2018

The 41-story Ko'ula residential tower is part of a 60-acre waterfront redevelopment in downtown Honolulu. Image: The Howard Hughes Corporation

Studio Gang has designed a 41-story residential high rise called Ko’ula that would be a central component within the 60-acre Ward Village master-planned community in Honolulu on the island of Oahu in Hawaii.

The tower will include 565 studio, one-, two-, and three-bedroom residences, each with its own lanai, or veranda. The design of the building—which twists as it rises and undulates to create a succession of different floor plans—recalls the shape of red sugarcane plants that once grew in this area.

The Howard Hughes Corporation is the developer on this tower and Ward Village. The design firm Yabu Pushelberg designed Ko’ula’s interiors, which will showcase natural materials, colors, and textures. The project has yet to name its other Building Team members.

A porte cochiere connects the high rise to an expansive courtyard. Image: The Howard Hughes Corporation

 

The high rise will connect to a public porch that opens onto an expansive courtyard that will serve as another entry point for Ward Village’s Central Plaza, which began construction earlier this year and whose first phase is expected to open to the public in January. The completed tower will include 58,300 sf of dining and retail spaces, 11,000 sf of open spaces, and 58,496 sf of recreational spaces.

Ko’ula’s residents will have exclusive access to a lobby and dropoff area located a level above the street.

A sales office that the design firm Woods Bagot converted from a 1960s-era office building will start taking purchase orders for Ko’ula’s residences later this year. Ko’ula is scheduled to break ground sometime in 2019, although no specific date has been set. Hughes has not disclosed a completion date nor the project’s anticipated cost.

One of the amenities decks within the Ko'ula high rise, which will offer 565 apartments. Image: The Howard Hughes Corporation

 

The Ward Village district is located between downtown Honolulu and Waikīkī. As part of the district’s redevelopment, Howard Hughes Corporation last summer topped off a 43-story mixed-use tower called Ke Kilohana, with 424 residential units, 375 of which targeting workforce buyers.  

When it’s completed, Ward Village will have 4,500 residences and one million sf of retail space. It is part of Ka’kaako, Honolulu’s commercial and retail district for which the city has laid out ambitious expansion plans that include 30 new buildings.

Related Stories

| Jan 28, 2014

First Look: BIG's Honeycomb building for Bahamas resort [slideshow]

BIG + HKS + MDA have unveiled the design for the new Honeycomb building and adjacent plaza in The Bahamas – a 175,000-sf residential facility with a private pool on each balcony.

| Jan 28, 2014

2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs

Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry. 

| Jan 28, 2014

16 awe-inspiring interior designs from around the world [slideshow]

The International Interior Design Association released the winners of its 4th Annual Global Excellence Awards. Here's a recap of the winning projects.

| Jan 24, 2014

Urban Land Institute, Enterprise outline issues in rental housing shortage: Report

Bending the Cost Curve: Solutions to Expand the Supply of Affordable Rentals outlines factors that impede the development of affordable rental housing – causing the supply in many markets to fall far short of the demand.

| Jan 22, 2014

SOM-designed University Center uses 'sky quads,' stacked staircases to promote chance encounters

The New School's vertical campus in Manhattan houses multiple functions, including labs, design studios, a library, and student residences, in a 16-story building.  

| Jan 13, 2014

Custom exterior fabricator A. Zahner unveils free façade design software for architects

The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.

| Jan 8, 2014

Strengthened sprinkler rules could aid push for mid-rise wood structures in Canada

Strengthened sprinkler regulations proposed for the 2015 National Building Code of Canada (NBCC) could help a movement to allow midrise wood structures.

Smart Buildings | Jan 7, 2014

9 mega redevelopments poised to transform the urban landscape

Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country. 

| Jan 3, 2014

World’s tallest vegetated façade to sprout in Sri Lanka [slideshow]

Set to open in late 2015, the 46-story Clearpoint Residences condo tower will feature planted terraces circling the entire structure. 

| Dec 31, 2013

BD+C's top 10 stories of 2013

The world's tallest twisting tower and the rise of augmented reality technology in construction were among the 10 most popular articles posted on Building Design+Construction's website, BDCnetwork.com.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021