flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Designs unveiled for new residential tower in Honolulu

Multifamily Housing

Designs unveiled for new residential tower in Honolulu

Studio Gang pays homage to sugarcane plants that were once prevalent in this area.


By John Caulfield, Senior Editor | November 20, 2018

The 41-story Ko'ula residential tower is part of a 60-acre waterfront redevelopment in downtown Honolulu. Image: The Howard Hughes Corporation

Studio Gang has designed a 41-story residential high rise called Ko’ula that would be a central component within the 60-acre Ward Village master-planned community in Honolulu on the island of Oahu in Hawaii.

The tower will include 565 studio, one-, two-, and three-bedroom residences, each with its own lanai, or veranda. The design of the building—which twists as it rises and undulates to create a succession of different floor plans—recalls the shape of red sugarcane plants that once grew in this area.

The Howard Hughes Corporation is the developer on this tower and Ward Village. The design firm Yabu Pushelberg designed Ko’ula’s interiors, which will showcase natural materials, colors, and textures. The project has yet to name its other Building Team members.

A porte cochiere connects the high rise to an expansive courtyard. Image: The Howard Hughes Corporation

 

The high rise will connect to a public porch that opens onto an expansive courtyard that will serve as another entry point for Ward Village’s Central Plaza, which began construction earlier this year and whose first phase is expected to open to the public in January. The completed tower will include 58,300 sf of dining and retail spaces, 11,000 sf of open spaces, and 58,496 sf of recreational spaces.

Ko’ula’s residents will have exclusive access to a lobby and dropoff area located a level above the street.

A sales office that the design firm Woods Bagot converted from a 1960s-era office building will start taking purchase orders for Ko’ula’s residences later this year. Ko’ula is scheduled to break ground sometime in 2019, although no specific date has been set. Hughes has not disclosed a completion date nor the project’s anticipated cost.

One of the amenities decks within the Ko'ula high rise, which will offer 565 apartments. Image: The Howard Hughes Corporation

 

The Ward Village district is located between downtown Honolulu and Waikīkī. As part of the district’s redevelopment, Howard Hughes Corporation last summer topped off a 43-story mixed-use tower called Ke Kilohana, with 424 residential units, 375 of which targeting workforce buyers.  

When it’s completed, Ward Village will have 4,500 residences and one million sf of retail space. It is part of Ka’kaako, Honolulu’s commercial and retail district for which the city has laid out ambitious expansion plans that include 30 new buildings.

Related Stories

Modular Building | Jan 21, 2015

Chinese company 3D prints six-story multifamily building

The building components were prefabricated piece by piece using a printer that is 7 meters tall, 10 meters wide, and 40 meters long. 

| Jan 19, 2015

Four Seasons tower will be Boston's tallest

On Jan. 14, 2015, developer Carpenter & Company and executives from the Four Seasons broke ground on the Four Seasons Hotel & Private Residences, which will become the tallest building in Boston at 699 feet.

Smart Buildings | Jan 7, 2015

Best practices for urban infill development: Embrace the region's character, master the pedestrian experience

If an urban building isn’t grounded in the local region’s character, it will end up feeling generic and out-of-place. To do urban infill the right way, it’s essential to slow down and pay proper attention to the context of an urban environment, writes GS&P's Joe Bucher.

| Jan 6, 2015

Construction permits exceeded $2 billion in Minneapolis in 2014

Two major projects—a new stadium for the Minnesota Vikings NFL team and the city’s Downtown East redevelopment—accounted for about half of the total worth of the permits issued. 

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

Sponsored | | Dec 30, 2014

Case studies: Engineered wood brings cost savings, design flexibility across commercial project types

For commercial architects facing increasing pressure to design innovative structures while simultaneously cutting costs and accommodating tight deadlines, engineered wood systems are providing a welcome solution. 

| Dec 28, 2014

Robots, drones, and printed buildings: The promise of automated construction

Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

| Dec 28, 2014

6 trends steering today's college residence halls

University students want more in a residence hall than just a place to sleep. They want a space that reflects their style of living and learning.

| Dec 22, 2014

Studio Gang to design Chicago’s third-tallest skyscraper

The first U.S. real-estate investment by The Wanda Group, owned by China’s richest man, will be an 88-story, 1,148-ft-tall mixed-use tower designed by Jeanne Gang.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021