flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Designs for community-based workspace in Carlsbad unveiled

Designs for community-based workspace in Carlsbad unveiled

make will include the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. 


By Cruzan | August 27, 2014
Cruzan announced make, a 175,000-square-foot office redevelopment project on the coast of Carlsbad, Calif. Cruzan will usher this next generation of community-based, integrated workspace into existence in fall 2014.
 
Housed in an industrial warehouse that was formerly home to the wholesale floral trade, the existing building will be redesigned under the overarching theme of making, to inspire the formation of new ideas and products. make will take full advantage of its coastal location with interior workspace that will easily spill outside, outdoor work and meeting spaces, storage for surfboards and bikes, a café with outdoor seating, rotating food trucks and a cutting-edge, integrated fitness center. An outdoor amphitheater can be used by tenants to host special events and cultivate community.
 
“Our ability to make something is what sets us apart, and we wanted to capture that unique human trait throughout this community-oriented space,” said Dennis Cruzan, founding partner of Cruzan. “This will be a one-of-a-kind work experience, uniquely integrated with its surroundings and built to foster great work. Carlsbad is home to many innovative companies, and we look forward to building this dynamic environment that will allow people to excel at what they do, make and create.”
 
Cruzan and their project design team, which includes Rapt Studio and OJB Landscape Architects, are working to create harmony between the built and natural environments. An L-shaped breezeway will be cut out from the existing structure and open to the ocean on one end and to community space at the other, while maximizing natural light to tenant areas.
 
make will feature other forward-thinking design elements, including the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. A second shipping container will be converted into a central distribution point for a bike share service that fosters easy access to and from the beach and other neighborhood amenities. make will also run a dedicated shuttle, offering tenants transportation to and from local surf spots, nearby restaurants and the Carlsbad Poinsettia COASTER station.
 
“This space is designed to motivate and inspire people to make and create,” said Cruzan. “To craft this cohesive design experience, we set out to design real connections — between the ocean setting, the indoor space, the outdoor environment and the culture of making. We are excited for companies from a wide range of industries to benefit from this community-centered workspace design and distinctive location.”
 
All renderings courtesy of Cruzan.
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Related Stories

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 22, 2011

Report finds that L.A. lags on solar energy, offers policy solutions

Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021