flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Designs for community-based workspace in Carlsbad unveiled

Designs for community-based workspace in Carlsbad unveiled

make will include the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. 


By Cruzan | August 27, 2014
Cruzan announced make, a 175,000-square-foot office redevelopment project on the coast of Carlsbad, Calif. Cruzan will usher this next generation of community-based, integrated workspace into existence in fall 2014.
 
Housed in an industrial warehouse that was formerly home to the wholesale floral trade, the existing building will be redesigned under the overarching theme of making, to inspire the formation of new ideas and products. make will take full advantage of its coastal location with interior workspace that will easily spill outside, outdoor work and meeting spaces, storage for surfboards and bikes, a café with outdoor seating, rotating food trucks and a cutting-edge, integrated fitness center. An outdoor amphitheater can be used by tenants to host special events and cultivate community.
 
“Our ability to make something is what sets us apart, and we wanted to capture that unique human trait throughout this community-oriented space,” said Dennis Cruzan, founding partner of Cruzan. “This will be a one-of-a-kind work experience, uniquely integrated with its surroundings and built to foster great work. Carlsbad is home to many innovative companies, and we look forward to building this dynamic environment that will allow people to excel at what they do, make and create.”
 
Cruzan and their project design team, which includes Rapt Studio and OJB Landscape Architects, are working to create harmony between the built and natural environments. An L-shaped breezeway will be cut out from the existing structure and open to the ocean on one end and to community space at the other, while maximizing natural light to tenant areas.
 
make will feature other forward-thinking design elements, including the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. A second shipping container will be converted into a central distribution point for a bike share service that fosters easy access to and from the beach and other neighborhood amenities. make will also run a dedicated shuttle, offering tenants transportation to and from local surf spots, nearby restaurants and the Carlsbad Poinsettia COASTER station.
 
“This space is designed to motivate and inspire people to make and create,” said Cruzan. “To craft this cohesive design experience, we set out to design real connections — between the ocean setting, the indoor space, the outdoor environment and the culture of making. We are excited for companies from a wide range of industries to benefit from this community-centered workspace design and distinctive location.”
 
All renderings courtesy of Cruzan.
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Related Stories

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 2, 2012

VLK Architects selected for new Cypress, Texas elementary school

The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.

| Feb 2, 2012

Mortenson Construction to build 2.4 MW solar project in North Carolina

Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Feb 1, 2012

‘Augmented reality’ comes to the job site

A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021