flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Designs for community-based workspace in Carlsbad unveiled

Designs for community-based workspace in Carlsbad unveiled

make will include the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. 


By Cruzan | August 27, 2014
Cruzan announced make, a 175,000-square-foot office redevelopment project on the coast of Carlsbad, Calif. Cruzan will usher this next generation of community-based, integrated workspace into existence in fall 2014.
 
Housed in an industrial warehouse that was formerly home to the wholesale floral trade, the existing building will be redesigned under the overarching theme of making, to inspire the formation of new ideas and products. make will take full advantage of its coastal location with interior workspace that will easily spill outside, outdoor work and meeting spaces, storage for surfboards and bikes, a café with outdoor seating, rotating food trucks and a cutting-edge, integrated fitness center. An outdoor amphitheater can be used by tenants to host special events and cultivate community.
 
“Our ability to make something is what sets us apart, and we wanted to capture that unique human trait throughout this community-oriented space,” said Dennis Cruzan, founding partner of Cruzan. “This will be a one-of-a-kind work experience, uniquely integrated with its surroundings and built to foster great work. Carlsbad is home to many innovative companies, and we look forward to building this dynamic environment that will allow people to excel at what they do, make and create.”
 
Cruzan and their project design team, which includes Rapt Studio and OJB Landscape Architects, are working to create harmony between the built and natural environments. An L-shaped breezeway will be cut out from the existing structure and open to the ocean on one end and to community space at the other, while maximizing natural light to tenant areas.
 
make will feature other forward-thinking design elements, including the conversion of a refurbished shipping container into a state-of-the-art coffee shop and café. A second shipping container will be converted into a central distribution point for a bike share service that fosters easy access to and from the beach and other neighborhood amenities. make will also run a dedicated shuttle, offering tenants transportation to and from local surf spots, nearby restaurants and the Carlsbad Poinsettia COASTER station.
 
“This space is designed to motivate and inspire people to make and create,” said Cruzan. “To craft this cohesive design experience, we set out to design real connections — between the ocean setting, the indoor space, the outdoor environment and the culture of making. We are excited for companies from a wide range of industries to benefit from this community-centered workspace design and distinctive location.”
 
All renderings courtesy of Cruzan.
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Related Stories

| Apr 25, 2012

Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center

Project receives LEED Gold Certification.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 25, 2012

Missner Group names McCrory VP of property management

McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.

| Apr 25, 2012

Rogers joins Morgan/Harbour as senior project manager

Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 24, 2012

Roofing Supply Group acquired by Clayton, Dubilier & Rice

RSG provides a complete offering of residential and commercial roofing materials and related supplies.

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021