flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design problems now the primary cause of construction claims and disputes

Codes and Standards

Design problems now the primary cause of construction claims and disputes

More likely to occur due to more tight timescales imposed upon third parties engaged in design.


By Peter Fabris, Contributing Editor | December 7, 2021
Cranes at a construction site

Courtesy Pixabay

Design problems are now the primary cause of construction claims and disputes, according to HKA's CRUX Insight 2020 report.

“Design problems are more likely to occur as a result of increasingly tight timescales imposed upon third parties engaged in design” that result in late or incomplete designs and conflict between the parties, the report says. “Failings in the management of third parties across increasingly complex supply chains” also cause major problems.

The consulting firm’s previous report had found that change in project scope was the number one cause for disputes. Projects have also become more prone to deficiencies in workmanship and unforeseen physical conditions, the report found.

The report’s data was primarily compiled before the start of the COVID-19 pandemic. The report examined construction issues in 1,185 projects worldwide with a combined value of $1.8 trillion. HKA expects an increase in arbitration over litigation to settle disputes in the coming years.

Related Stories

Codes and Standards | Mar 21, 2018

Cape Town, South Africa’s dire water supply crisis raises concerns in the U.S.

Los Angeles, Salt Lake City, and Miami among cities at risk for water shortages.

Codes and Standards | Mar 20, 2018

Report shows how LEED certification supports net zero energy

Whole-building energy simulation, ASHRAE compliance requirement are key factors.

Codes and Standards | Mar 15, 2018

Energy efficiency measures contributing to flat demand for power

Utilities having difficulty adjusting to new business environment.

Codes and Standards | Mar 14, 2018

New parking lighting technology is paying off, Energy Dept. says

Newer products can cut energy costs by as much as 70%.

Codes and Standards | Mar 13, 2018

OSHA delays enforcement of beryllium exposure rule

The Occupational Safety and Health Administration (OSHA) voted to delay new beryllium exposure rules until May 11.

Codes and Standards | Mar 12, 2018

L.A. mayor proposes mandatory seismic retrofits for steel buildings, daycare centers, private schools

Los Angeles Mayor Eric Garcetti has proposed a seismic retrofit requirement for vulnerable steel buildings built before the 1994 Northridge earthquake.

Codes and Standards | Mar 8, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

Codes and Standards | Mar 7, 2018

Dept. of Energy says 2016 ANSI/ASHRAE/IES Standard 90.1 would save 8.2% of energy costs

Favorable comparison to 2013 standard for commercial buildings.

Codes and Standards | Mar 6, 2018

Well Living Lab launches extensive study on how indoor environments affect people’s lives

Factors that impact health, performance, stress and resiliency, sleep, and comfort to be scrutinized.

Codes and Standards | Mar 5, 2018

New guide helps planners assess innovation districts

The document is designed to aid in targeting resources toward innovative and inclusive economic development based on an area’s unique strengths and challenges.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021